Site work and paving for a road / highway in Cascade, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000340966 North Slope Recreation Area, located along the Pikes Peak Highway, is owned by the Colorado Springs Utilities with recreation managed by the City of Colorado Springs Parks, Recreation and Cultural Servies. The recreation area provides hiking, biking and fishing around the North and South Catamount Reservoirs. The Limber Pine Trail improvements will provide improved trail connection on singletrack trail through the recreation area. The new trail will provide a unique trail experience with stunning viewsheds, wilderness interactions and new non-motorized trail connectivity within the area. A trails' contractor is solicited to build this trail deploying low-impact methods using hand-built and/or machine-built techniques to complete a finished trail. Question Deadline 02/08/2024 at 5:00 PM MT All questions shall be submitted electronically via the BidNet Direct Procurement Platform, Requests for Information, support and questions shall be directed to: Alyssa Lee Alyssa.Lee@coloradosprings.gov Job Location North Slope Recreation Area Limber Pines Trail General Requirements - Bid Deposit Required - Insurance Required Bid open link https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NTY0OWRjZGMtZjJjNy00YWE1LTliZTMtZThiYWNkNWQ2NTg5%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252290f74bf0-a593-4c12-9591-fb8ef4ba6ad1%2522%252c%2522Oid%2522%253a%2522dc36abda-78bf-461c-a321-a528ac3cb37a%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=4c8ae929-c302-4ef5-97c1-dc488d15d42c&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true PRE-BID CONFERENCE A pre-bid meeting will be held via Microsoft Teams at 10:00AM MST Thursday, February 1, 2024. This meeting is highly encouraged but not mandatory. Dial in information is: Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 258 563 788 172 Passcode: dLhQpn Download Teams | Join on the web Or call in (audio only) +1 720-617-3426,,554686931# United States, Denver Phone Conference ID: 554 686 931# Bonding Requirements - Bid Bond 5 % *Estimated Project Magnitude: $50,000 - $100,000 Overview North Slope Recreation Area, located along the Pikes Peak Highway, is owned by the Colorado Springs Utilities with recreation managed by the City of Colorado Springs Parks, Recreation and Cultural Servies. The recreation area provides of hiking, biking and fishing around the North and South Catamount Reservoirs. The Limber Pine Trial improves will provide improved trail connection on singletrack trail through the recreation area. The new trail will provide a unique trail experience with stunning viewsheds, wilderness interactions and new non-motorized trail connectivity within the area. A trails' contractor is solicited to build this trail deploying low-impact methods using hand-built and or/machine-built techniques to complete a finished trail. Project Scope of Work Work to be completed under this contract consists of furnishing all labor, materials, and equipment, to construct the natural surface trails identified within this request for proposal. The Limber Pine Trail includes two segments of trail connecting from existing sections of the Limber Pine Trail and the utility road. The trail is designated as non-motorized recreational trails open to hiking, mountain biking and equestrian use rated at an Intermediate skill level (Blue). The Limber Pine Trail project is divided into two segments for the descriptions. The conditions, soil, slope, aspect and vegetation are similar. The East Segment is slightly more open with less trees per acre with a fuel mitigation project several years ago. Contractor to install a total of 4 carsointe signposts, provided by the City. The posts will be installed at each end of each trail segment. Locations to be marked in the field. Posts to be installed to a depth of 20". West Alignment This alignment, estimated at 2,353 LF will provide a reroute to the of a steep section of existing trail. The trail contours the hillside descending to the utility road. The trail passes through a few locations with larger fieldstones, all workable with trail equipment. The rocks should be incorporated into the trail tread when possible. The tree density is light to moderate with minimal tree removal anticipated. East Alignment Segment 2, estimated at 3,580 LF is a new trail segment east of the Utility Road. This new trail will establish a new singletrack trail so trail users no longer need to utilize the gravel road. This segment passes through a more robust mitigation project from many years ago. The tree spacing is less frequent, and more grasses slopes and low growing vegetation. The trail will tie into the existing Limber Pine Trail along the shoreline of South Catamount Reservoir. These trail segments specific sites are identified on the Project Map. The trails will be nonmotorized recreational use on the multi-use trails and are anticipated with an approximated breakdown at 60% bikes, 40% hikers. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

5

3

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
86
Bidding Soon
1,323
All Active Projects
548
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2024

April 30, 2024

November 16, 2024

img_map_placeholder

Pikes Peak Hwy, Cascade, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.