BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Site work and paving for a mixed-use development in Fremont, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project is more specifically defined in the Contract Documents, but generally includes the following items of work: Furnish and maintain traffic control throughout the period of construction; maintain pedestrian barricades and detour pedestrian traffic around the work area; demolish and dispose of existing improvements including asphalt pavement, curb, gutter, sidewalk, curb access ramp, medians; construct bicycle/pedestrian protected intersection improvements, remove right turn slip lane at California Street intersection, install a RRFB system at California Street and Walnut Avenue intersection, relocate storm drain inlets, install landscape strip area and upgrade median landscaping; upgrade existing curb access ramp, place hot mix asphalt concrete pavement, apply a slurry seal treatment, install striping and pavement markings. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Special Provisions. Question Deadline 02/13/2024 at 3:00 PM PT Questions submitted online Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: Two Hundred Twenty-Five (225) Working Days . Notice to Proceed shall not be given until 30 working days before pole delivery date has been confirmed with a statement from the vendor. No Pre-Bid Conference For This Project

Award

Roads / Highways

$3,025,130.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
192
Bidding Soon
3,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

Project location map

Walnut Ave, Fremont, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.