Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work and paving for a mixed-use development in Fremont, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The project is more specifically defined in the Contract Documents, but generally includes the following items of work: Furnish and maintain traffic control throughout the period of construction; maintain pedestrian barricades and detour pedestrian traffic around the work area; demolish and dispose of existing improvements including asphalt pavement, curb, gutter, sidewalk, curb access ramp, medians; construct bicycle/pedestrian protected intersection improvements, remove right turn slip lane at California Street intersection, install a RRFB system at California Street and Walnut Avenue intersection, relocate storm drain inlets, install landscape strip area and upgrade median landscaping; upgrade existing curb access ramp, place hot mix asphalt concrete pavement, apply a slurry seal treatment, install striping and pavement markings. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Special Provisions. Question Deadline 02/13/2024 at 3:00 PM PT Questions submitted online Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: Two Hundred Twenty-Five (225) Working Days . Notice to Proceed shall not be given until 30 working days before pole delivery date has been confirmed with a statement from the vendor. No Pre-Bid Conference For This Project
Award
Roads / Highways
$3,025,130.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
June 2, 2025
Walnut Ave, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: Feb 27 2024
Fremont, CA
Bid Date: Mar 05 2024
Fremont, CA
Bid Date: Aug 25 2021
Fremont, CA
Bid Date: Jun 30 2021
Fremont, CA
Bid Date: Apr 28 2021
Fremont, CA
Bid Date: Jun 09 2020
Fremont, CA
Bid Date: Apr 23 2019
Fremont, CA
Bid Date: Mar 12 2019
Fremont, CA
Bid Date: Mar 05 2024
Fremont, CA
Bid Date: Jan 19 2024
Fremont, CA
Bid Date: Dec 17 2024
Fremont, CA
Bid Date: Jun 11 2020
Fremont, CA
Bid Date: Sep 15 2020
Fremont, CA
Bid Date: Dec 19 2023
Fremont, CA
Bid Date: Dec 19 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
