Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Fremont, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The City of Fremont proposes to conduct roadway improvements and upgrades along Thornton Avenue from Dondero Way / San Pedro Dr. to Fremont Boulevard, Fremont Boulevard from Alder Avenue to Mattos Drive, and Peralta Boulevard from Fremont Boulevard to Sequoia Road. Along Thornton Avenue, travel lanes will be narrowed in order to install bicycle detection sensors, buffered bike lanes, pedestrian countdown lights and accessible push buttons at all signals. Around the vicinity of Thornton Junior High School, pedestrian improvements will be constructed which will consist of installing curb extensions, new crosswalks with a new signal, and ADA curb ramps. Additionally, roadway pavement will be restriped, including the installation of green skip striping through conflict zones. The same improvements will be constructed along Fremont Boulevard, with the addition of adding on-street parking between Thornton Avenue and Bonde Way, as well as landscape and streetscape improvements. Street improvements on Peralta Boulevard will include reducing the street section to one lane in each direction from its intersection with Fremont Boulevard to Sequoia Road. Left turn pockets, and buffered bike lanes will be added. Additional improvements along Peralta Boulevard will include closing any sidewalk gaps, upgrading curb ramps to meet current ADA standards, and preserving parking on both sides of the street near its intersection with Sequoia Road. Pavement rehabilitation work will be included as needed. All work will be conducted within the local right-of-way, in Fremont, Alameda County. All responsive proposals shall be reviewed and evaluated by the City in order to determine which proposer best meets the City's needs for this Project. The criteria by which the City shall evaluate proposals are set forth in this RFP. The City reserves the right to reject any and all proposals or waive any irregularities in any proposal or the proposal process. The City reserves the right to negotiate the terms of the Agreement for this Project with one or more proposers. The schedule shall include a Construction Schedule of 120 working days. CA.Q & A deadline: Feb 13, 2024 6:00:00 PM EST The sole point of contact for information pertaining to this RFP is www.periscopeholdings.com. Communication with City staff about the scope of services or anything else related to this RFP is forbidden. If any proposer has any question regarding the meaning of any part of this RFP, or finds discrepancies in or omissions from this RFP, the proposer shall submit any questions through the City of Fremont's online bidding provider at www.periscopeholdings.com To ensure there is equal participation of the DBE groups specified in 49 CFR 26.5 the City of Fremont specifies 5.0 percent for this project.
Post-Bid
Roads / Highways
$10,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
April 29, 2024
Multiple Locations, Fremont, CA
Related To This Project
Fremont, CA
Bid Date: Mar 05 2024
Fremont, CA
Bid Date: Aug 25 2021
Fremont, CA
Bid Date: Jun 30 2021
Fremont, CA
Bid Date: Apr 28 2021
Fremont, CA
Bid Date: Jun 09 2020
Fremont, CA
Bid Date: Apr 23 2019
Fremont, CA
Bid Date: Mar 12 2019
Fremont, CA
Bid Date: Mar 23 2021
Fremont, CA
Bid Date: Mar 05 2024
Fremont, CA
Bid Date: Jan 19 2024
Capacity Enhancement Along Laguna Creek (Line E) From South Grimmer Blvd to Auto Mall Pkwy - 5254957
Fremont, CA
Bid Date: Feb 06 2024
Fremont, CA
Bid Date: Jun 11 2020
Fremont, CA
Bid Date: Sep 15 2020
Fremont, CA
Bid Date: Dec 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.