EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 18, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Fremont, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project is more specifically defined in the Contract Documents, but generally includes the following items of work: Furnish and maintain traffic control throughout the period of construction; maintain pedestrian barricades and detour pedestrian traffic around the work area; demolish and dispose of existing improvements including asphalt pavement, curb, gutter, sidewalk, curb access ramp, medians; construct bicycle/pedestrian protected intersection improvements, remove right turn slip lane at California Street intersection, install a RRFB system at California Street and Walnut Avenue intersection, relocate storm drain inlets, install landscape strip area and upgrade median landscaping; upgrade existing curb access ramp, place hot mix asphalt concrete pavement, apply a slurry seal treatment, install striping and pavement markings. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Special Provisions. Question Deadline 02/13/2024 at 3:00 PM PT Questions submitted online Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: Two Hundred Twenty-Five (225) Working Days . Notice to Proceed shall not be given until 30 working days before pole delivery date has been confirmed with a statement from the vendor. No Pre-Bid Conference For This Project

GC Bidding

Roads / Highways

$3,400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
105
Bidding Soon
1,829
All Active Projects
853
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

June 2, 2025

img_map_placeholder

Walnut Ave, Fremont, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Walnut Avenue Bikeway Phase 2 Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.