Published March 14, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Kennett Square, Pennsylvania. Working plans call for site work for a educational facility; and for paving for a sidewalk / parking lot.

As of March 14, 2024 project has been canceled. As of this time it is unknown if an when project will rebid. Unionville-Chadds Ford High School Campus Circulation and Parking Improvements All questions should be submitted electronically. Telephone inquiries and paper submissions will not be accepted. Separate Bids will be received for Contract No. 1 - Site Construction and Contract No. 2 - Electrical Construction. Bids shall be on a lump sum and unit price basis for Contracts 1 and 2. The Bids must cover all costs for the completion of this project as set forth and illustrated in the Project Plans, Project Manual, and associated documents. The principal items of work to be performed under Contract No. 1 - Site Construction, as more fully described in the Project Plans and Project Manual, are: 1) installation of erosion and sedimentation controls; 2) demolition of existing features, including but not limited to the existing tennis courts, parking areas and access drives, storm drainage features, and trees and shrubs; 3) earthmoving and stabilization; 4) construction of new parking areas, access drives, and sidewalks; 5) construction of a cast-in-place concrete retaining wall; 6) construction of new tennis courts and fencing; 7) installation of storm drainage improvements; 8) installation of traffic control devices, lawn, and landscaping. The principal items of work to be performed under Contract No. 2 - Electrical Construction, as more fully described in the Project Plans and Project Manual, are: 1) site lighting to support new parking lot layout along with circuiting and lighting controls; 2) circuiting and time clock control for 120V receptacles near designated parking spots; and 3) Re-routing of existing feeders that conflict with new storm drainage Bid Results :: Contract No. 1 (Site Construction) :: Iron Eagle Excavating :: $ 5,338,400.0 Contract No. 2 (Electrical Construction) :: JT Electrical LLC :: $ 775,000.0 Project has been cancelled The Owner has decided not to accept the bids received. The project is currently on hold.

Final Planning

Sidewalks / Parking Lot

$6,113,400.00

Public - State/Provincial

Paving, Site Work

65

25

46

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
174
Bidding Soon
2,681
All Active Projects
1,287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

September 16, 2024

img_map_placeholder

740 Unionville Rd, Kennett Square, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Campus Circulation and Parking Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.