BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kennett Square, Pennsylvania. Working plans call for site work for a educational facility; and for paving for a sidewalk / parking lot.

As of March 14, 2024 project has been canceled. As of this time it is unknown if an when project will rebid. Unionville-Chadds Ford High School Campus Circulation and Parking Improvements All questions should be submitted electronically. Telephone inquiries and paper submissions will not be accepted. Separate Bids will be received for Contract No. 1 - Site Construction and Contract No. 2 - Electrical Construction. Bids shall be on a lump sum and unit price basis for Contracts 1 and 2. The Bids must cover all costs for the completion of this project as set forth and illustrated in the Project Plans, Project Manual, and associated documents. The principal items of work to be performed under Contract No. 1 - Site Construction, as more fully described in the Project Plans and Project Manual, are: 1) installation of erosion and sedimentation controls; 2) demolition of existing features, including but not limited to the existing tennis courts, parking areas and access drives, storm drainage features, and trees and shrubs; 3) earthmoving and stabilization; 4) construction of new parking areas, access drives, and sidewalks; 5) construction of a cast-in-place concrete retaining wall; 6) construction of new tennis courts and fencing; 7) installation of storm drainage improvements; 8) installation of traffic control devices, lawn, and landscaping. The principal items of work to be performed under Contract No. 2 - Electrical Construction, as more fully described in the Project Plans and Project Manual, are: 1) site lighting to support new parking lot layout along with circuiting and lighting controls; 2) circuiting and time clock control for 120V receptacles near designated parking spots; and 3) Re-routing of existing feeders that conflict with new storm drainage Bid Results :: Contract No. 1 (Site Construction) :: Iron Eagle Excavating :: $ 5,338,400.0 Contract No. 2 (Electrical Construction) :: JT Electrical LLC :: $ 775,000.0 Project has been cancelled The Owner has decided not to accept the bids received. The project is currently on hold.

Final Planning

Sidewalks / Parking Lot

$6,113,400.00

Public - State/Provincial

Paving, Site Work

65

25

46

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
313
Active Projects
139
Bidding Soon
2,638
All Active Projects
1,218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

September 16, 2024

img_map_placeholder

740 Unionville Rd, Kennett Square, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.