BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Renovation of a conference / convention center in Kalamazoo, Michigan. Completed plans call for the renovation of a conference / convention center.

Questions Due: February 14, 2024 All bidders, including subcontractors, with bids in excess of $50,000 must be prequalified through the Kalamazoo County responsible bidder program. Responsible Bidders Applications are only good for one year. Responsible Bidder forms can be found on the website The County Expo Center is a 100,000 sq. ft. multi use expo, meeting, and event facility. Annually over 250 events are held. The building was constructed in multiple phases. The proposed projects include replacing all HVAC equipment and controls in the Room A building and support spaces that are part of the overall complex of buildings. The purpose of this project is to replace a chilled water and steam to hot water boiler system with new grade mounted packaged gas and DX rooftop units (RTU) and a high efficiency boiler, AHU, and roof mounted condensing unit. New rooftop units will require gas piping and pads. Demolition of heating water system is included in the scope of work to include the boiler, pumps, piping, accessories, and terminal devices including radiation heat, unit heaters, and a makeup air unit.

Bid Results

Conference / Convention Centers

$419,250.00

Public - County

Renovation

19

8

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
3
Bidding Soon
946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 28, 2024

Project location map

2900 Lake St, Kalamazoo, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.