BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2024 at 7:00 PM

Updated February 28, 2024

Site work for a mixed-use development in Pinson, Tennessee. Completed plans call for site work for a development.

1.The Contractor shall remove decking section (8 Feet approximately) at a time to expose lateral runners and cross supports. The Contractor shall cut the post set in the swamp bed at decking level or at a point where solid original post becomes solid with no rot or decay. 2.The Contractor shall cut to flat a 16-inch section of this post (no more than one third shall be trimmed) and bolt a new post at this point by flattening the new post in the same manner. The flattened area shall be 16 inches in length. The Contractor shall use galvanized bolts to join the 2-post applying water seal at the point of cuts and bolts. 3.The Contractor shall supply and install new 2 inch by 10-inch cross supports one each on both sides of the post splice and bolt through both cross supports and post to re-enforce. 4.The Contractor shall provide and install new lateral supports on 16-inch centers starting on the outside edges and working to the center totaling 5 laterals. (Centers may not work out to exact 16 inches and that is acceptable. 5. The Contractor shall provide new decking to be installed in laterals. Decking shall be no less than 6 inches in width or no greater than 10 inches. Thickness shall be maintained at a minimum of 2 inches thick. Each decking board shall have 3 outdoor rated deck screws at each lateral. 6.The Contractor shall provide and install three new band boards on the inside of the post of a minimum 2 inch by 8 inch. The first (bottom) shall be no more than 2 inches above the decking with the remainder being spaced evenly to 38.5 inches. 7.The Contractor shall provide and install a cap board of no less than 2inches by 8 inches over post and band boards. Post shall be cut even with band boards and water seal must be applied to post cut before cap board installation. Cap boards shall be fastened on 16-inch intervals with outdoor rated deck screws. Finish height with cap boards should be approximately 40 inches. 8.The Contractor shall perform work without removing more than two sections at a time (if possible) for the entire 300-foot distance. All bids over $100,000 shall include provisions for a payment bond All bids over $100,000 shall include provisions for a payment bond in the amount of twenty-five percent (25%) of the contract price.

Post-Bid

Conservation and Development

$100,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
62
Bidding Soon
568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2024

March 18, 2024

Project location map

460 Ozier Rd, Pinson, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.