BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Council, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work includes Recycled Asphalt Base and HMA paving of 0.75 miles of roadway (approximately 1,350 tons of HMA paving). Site Directions: Missman Road from Orchard Road to Mill Creek Road Question Deadline 02/19/2024 at 5:00 PM MT Est. Value: $ 500,000.00 Est. Completion Date: Oct. 4, 2024 It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned which are necessary in order to provide a complete installation shall be included in the bid and shall conform to all Local, State and Federal requirements. The work includes Recycled Asphalt Base and HMA paving of 0.75 miles of roadway (approximately 1,350 tons of HMA paving). Please contact Trevor Howard (208-559-2663, thoward@saiservices.com) if you have any questions. Work includes all labor, materials, equipment, services, and documentation necessary to construct the Project defined herein. The Work may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents. The Contractor shall complete all Work as specified or indicated in the Contract Documents. The Project is generally described as follows: 1. 2024 Pavement Preservation-Missman Lane project which includes approximately 8,000 SY of RABS and 1,350 tons of HMA paving 2. The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located Missman Lane from Orchard Road to Mill Creek Road. All questions or requests for additional information must be submitted in writing to the County's engineering consultant no later than 5:00 pm on February 12, 2023. Any changes to the Plan and Specifications will be in the form of a written addendum which will be made available to all plan holders by 1:00 PM on February 14, 2024. Please contact Trevor Howard (208-559-2663, thoward@saiservices.com) with any project related questions.

Award

Roads / Highways

$229,250.00

Public - County

Paving, Site Work

5

9

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
132
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 25, 2024

img_map_placeholder

Missman Rd, Council, ID

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.