Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Site work and paving for a sidewalk / parking lot in Council, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of August 13th, 2025, the project was awarded to Straitcrete LLC, with an awarded amount of $68,753.** Council School District is requesting bids from qualified contractors for concrete flat work the elementary and high school. Approximately 3500 square feet of new 4" and 6" walkways are to be installed. Minor regrading and seeding is also included in bid. Work must be completed prior to the beginning of school. For more detailed information contact Mindy Ivey@mivey@csd13.org Excavate area on the north side of the elementary school to allow for new concrete and regrading to eliminate water next to the building. Pour a new concrete slab next to the building approx.. 10 ft. x 80 ft. with a slope of minimum of 14 inch per foot. Remove existing lawn/ dirt from the entire north side of the building to the parking lot and regrade to allow water to flow away from the building. Hydroseed all areas from concrete to parting lot. Remove broken concrete by entry (approx.. 120 sq. ft.); bring area up to grade with road mix and repour area with new 4" slab. All new concrete areas to have a minimum of 4" compacted road mix under concrete. All concrete to be 6 sack mix. Expansion joints and needed Excavate apporx 10" of lawn and dirt to allow for new concrete pad and walkway connecting weight room and elementary school parking lot. All concrete in this area to be 6" thick and 6 sack concrete. A 20 x 50 foot slab will be poured on the South side of the weight room. An 8 ft wide concrete walkway will be installed connecting this slab and the elementary school parking lot. A minimum of 4" of compacted road mix is required for all concrete. Control/ expansion joints as needed. Upon completion topsoil will be placed next to new concrete and areas graded to match existing lawn and areas and reseeded. All disturbed area will be regraded and reseeded to match existing.

Under Construction

Sidewalks / Parking Lot

$68,753.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
31
Bidding Soon
248
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

Multiple Locations, Council, ID

Fuel growth with access to the bidding project info your business needs.