BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Twinsburg, Ohio. Completed plans call for site work for a road / highway.

This project consists of re-painting existing traffic lane lines, stop bars, cross walks, lane arrows, and other pavement markings throughout the City, with certain restrictions as denoted herein. The roadway restriping project will begin June 9th and be completed by July 28th. The City has the right to award this project to the lowest, competent and most responsible bidder. This project consists of re-painting existing traffic lane lines, stop bars, cross walks, lane arrows, and other pavement markings throughout the City, with certain restrictions as denoted herein. The roadway restriping project will begin June 9th and be completed by July 28th. The City has the right to award this project to the lowest, competent and most responsible bidder. Contactor shall review all streets with Engineering Department since some roadway striping is no longer visible, and some striping is being extended. Quantities shown in Table 1and Table 2 are approximate only - all discrepancies must be brought to the attention of the Engineer prior to installing striping on that street. Contractor shall submit daily quantities for each pay item by the end of each work day via office E-Mail to the Engineering Department. They shall update the quantity sheets (Table 1 & Table 2), in Excel format, for stop bars, arrows and cross-walk lines for all intersections including actual lane line lengths on the street list. City templates for arrows, words, etc. must be used. Contractor shall contact the Director of Public Works for the City Service Department to arrange pickup. These templates cannot be taken outside of the City. Contractor's foreman shall comply with all requests by the Director of Public Works before acquiring the templates including leaving a photo ID and security deposit. All templates must be returned clean and in a pre-existing condition. The following streets/pavement markings shall not be re-painted due to current construction projects and asphalt resurfacing on the following streets. Contractor shall schedule their work so as not to interfere with the annual Roadway Improvements Project that will be underway and to prevent gaps in the restriping of asphalt resurfaced roadways. a. Highland Road, from Darrow Road (not including the intersection) to the City Limits will not be repainted, as it is part of the road improvement program. b. Ravenna Road, from SR 82 to Shepard Rd crosswalks - The City has applied for state funding to replace existing standard crosswalk markings with Continental style crosswalks. If the City receives this funding, the affected crosswalks (up to 4,014 LF of linework) may be removed from this contract.

Award

Roads / Highways

$152,688.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
134
Bidding Soon
2,142
All Active Projects
908
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 15, 2024

June 9, 2024

July 28, 2024

img_map_placeholder

Multiple Locations, Twinsburg, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.