BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Elk Grove Village, Illinois. Completed plans call for the renovation of a water / sewer project.

2024 Rainbow Falls Lazy River Filtration Pump Replacement. All Bidders Must Submit a Bid Bond or Cashier's or Certified Check for 10% of the Total Contract Amount With Their Bid Form. The Contractor shall commence work no later than September 3, 2024, and perform all work on a regular full-time basis during weekdays until final completion. The General Prevailing Rate of Wages in the Locality for Each Craft or Type of Worker or Mechanic Needed to Execute the Contract or Perform the Work, and the General Prevailing Rate for Legal Holiday and Overtime Work, as Ascertained by the Park District or the Illinois Department of Labor Shall Be Paid for Each Craft or Type of Worker Needed to Execute the Contract or to Perform Such Work and It Shall Be Mandatory Upon the Contractor to Whom the Contract is Awarded and Upon Any Subcontractor Under Him to Pay Not Less Than the Specified Rates to All Laborers, Workers and Mechanics Employed by Them in the Execution of the Contract or Such Work. Performance Bond - If a Bid is accepted, a surety Performance Bond, payable to the Elk Grove Park District, in the full amount of the Bid and additionally guaranteeing the faithful performance of the prevailing wage clause shall be delivered to the Park District within 10 calendar days after Owner's acceptance of the Bid. Labor & Material Bond - If a Bid is accepted, a Labor and Materials Payment surety Bond, payable to the Elk Grove Park District, in the full amount of the contract and additionally guaranteeing the faithful performance of the prevailing wage clause shall be delivered to the Park District within ten calendar days after Owner's acceptance of Bid. Question Deadline 02/07/2024 at 10:00 AM CT

Award

Water / Sewer

$52,486.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
127
Bidding Soon
2,001
All Active Projects
864
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

September 3, 2024

img_map_placeholder

200 Rev Morrison Blvd, Elk Grove Village, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.