Site work for a civil project in Mount Pleasant, South Carolina. Completed plans call for site work for a water / sewer project.

MPW is issuing this Request for Qualifications (RFQ) to obtain a statement of qualifications from interested general contracting firms that have the capability and interest in undertaking and performing the scope of work described in this RFQ. The RFQ is being publicly advertised in accordance with SCIIP procurement guidelines. Please visit MPW's website for more information. MPW has received SCIIP grants for two gravity wastewater collection system projects as outlined below: Project No. 1 - Septic Tank Abatement Project: - MPW Project No. SCL2311 - SCIIP Grant No. A-23-C136 - Will be bid under seven (7) separate contracts, anticipated to be released for bid by early summer of 2024. - Project durations vary based on the contract. All construction must be completed in spring of 2026. Installation of an estimated 8,500 LF of gravity sewer and force mains to serve 86 properties throughout the Shem Creek Water Shed currently relying on septic tanks. Installation of an estimated 3,800 LF of gravity sewer and force mains to serve 26 current residents located in three neighborhoods within the Seven Mile Community currently relying on septic tanks. Project No. 2 - Snowden Phase 3 Gravity Wastewater Extension: -MPW Project No. SCL2312 - SCIIP Grant No. A-23-C137 - Anticipated to be released for bid in the late spring of 2024. - Project duration is anticipated to be approximately 19 months. Installation of an estimated 7,300 LF of gravity sewer main to serve 62 properties currently relying on septic tanks The General Contractor's experience on such projects must include deep gravity collection line construction (greater than 15 feet deep) with heavy ground water requiring dewatering, bypass pumping of existing wastewater flows, connecting to existing structures and gravity collection piping, traffic control, coordination with the public and private property owners, working around and accommodating other existing utilities within the construction corridor/trench, working with other agencies such asthe Town of Mount Pleasant and SCDOT, performing various site restoration, and developing detailed project schedules and adhering to such schedules. General elements of work include but are not limited to: - Sheeting and shielding of trench walls associated with linear open-trench construction in marginalsoil conditions. - Multiple bank well point dewatering systems. - Removal and replacement of unsuitable pipe foundation and back-fill materials. - Roadway restoration including controlled density fill placement, milling and overlay of asphalt pavements. - Coordination of existing system outages as required for connection to existing facilities. - Roadway "Jack & Bore" construction under paved surfaces. -Relocation of conflicting utilities - Traffic control plans and all associated equipment and personnel to implement same, including the use of "Jersey Barriers", manually controlled detours, and the use of all SCDOT required barriers and signage in accordance with Manual of Uniform Traffic Control Devices (MUTCD), latest edition. - Ancillary sedimentation and erosion control activities unique to linear utility projects, including providing certified erosion and sediment control inspection services. - Projects in restricted project environments requiring minimum open-trench lengths, restricted soil stockpile and material staging areas. - Surface restoration including tree mitigation, arborist directed tree limb and root pruning, seeding, sodding and replacement of other ancillary landscape plant materials and hardscape. - Compliance with all applicable Town ordinances and work restrictions. - Comply with all applicable regulatory agency permit conditions including sedimentation and erosion control NPDES SWPPP/MS4 compliance, traffic control, applicable public relations and return-toservice facility commissioning requirements. - Developing and updating a detailed project schedule. Include milestone dates and any owner activities. Schedule should be updated at a minimum of monthly for a standing progress meeting that occurs throughout the project completion. Final date to submit written questions/clarifications 4:00 PM, February 12, 2024. Contractors shall address questions concerning the prequalification form to Bryan Brooks at the following email address: bbrooks@mpwonline.com.

Post-Bid

Water / Sewer

$1,700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
52
Bidding Soon
518
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 29, 2024

img_map_placeholder

1619 Rifle Range Rd, Mount Pleasant, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.