Site work, paving and new construction of a mixed-use development in Edgewater, Florida. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; for paving for a municipal facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; water / sewer project; and water / sewer project.

As of April 3, 2024, the owner is in the process of selecting a construction manager at risk. With the adoption of the FY23-24 City budget, the Council of the City of Edgewater ("City") approved the construction of Phase I of a new Public Works Facility. The construction of this facility will improve the services the City provides to its stakeholders. Further, this facility will be crucial in continuing to meet the needs of our growing community, delivering essential services efficiently, and promoting sustainability. The City contracted with Schenkel Shultz Architecture as the Design Professional (DP) to design 100% plans and secure the needed permits for the facility's site development and construction. FDEP permit applications have been submitted for the construction of a domestic wastewater collection/transmission system and a State 404 Program Permit. The City is looking for a skilled and committed Construction Management/General Contracting Services (CM/GC) firm to help achieve this ambitious project goal. This partnership will play a critical role in overseeing the project from start to finish, prioritizing quality, safety, and cost management at each construction phase. The Construction Manager will confirm all subcontractors have secured all the necessary construction and development permits during the project's construction phase. The purpose of this qualification-based solicitation (RFQ) is to select the most appropriate firm(s) to provide the requested services within the City's established budget. It is anticipated that one (1) firm will be awarded a basic contract to provide the necessary Part A, Pre-Construction Phase Services Contract, and a Part B, Construction Phase Services Contract, for twenty-four (24) months or until project completion, whichever occurs later, exercisable at the option of the City. It should be emphasized that the award of Part A-Pre-Construction Services does not guarantee the provision of Part B-Construction Services. Given the phased nature of the project, separate City Council actions will be required for both Part A and Part B. Background The City is seeking to construct a new Public Works Facility on vacant city-owned land located north of Dale Street and west of the ParkTowne Industrial Center in the City of Edgewater, Florida. The scope of this project is to construct Phase I of a multi-phased project to construct a new Public Works Facility. Phase I of the facility will be used for transitioning the City's fleet and fueling operations, as well as the new staging location for the Public Works and Environmental Services Department Administrative Divisions. The scope of work under this solicitation shall include Construction Management/General Contracting Services (CM/GC) by a licensed general contractor for the construction of Phase I of the new facility and related site improvements. Site development includes onsite utilities, paving, grading, and drainage. Construction of Phase I will include approximately 7,500 sq. ft. of administration building, approximately 16,000 sq. ft. of fleet maintenance building, fuel tanks, and a vehicle fueling site. The site will also have 6.49 acres of asphalt parking and driveways, which includes 78 parking spots. The project is planned to be constructed under a CM/GC delivery method with a construction duration of twenty-four (24) months. Phase II is considered to bring the future site buildout, as designed. The facility at buildout is anticipated to contain an additional 33,000 sq. ft. of administration building, an 11,300 sq. ft. warehouse, and a 2,400 sq. ft. wash building. If the City's savings are realized through Part A Preconstruction of this scope, additional items, systems, or functional portions beyond the scope of Phase I will be pursued. This includes elements of the Phase 2 Construction buildout. The City intends to invest all funds available in the most functional facility possible towards full buildout. Deadline for Questions:February 20, 2024, 2:00pm THIS PROJECT CONSISTS OF A NEW PUBLIC WORKS COMPLEX OF SINGLE STORY STRUCTURES ON 18.80 ACRES.

Post-Bid

Municipal

$3,220,000.00

Public - City

New Construction, Paving, Site Work

173

3

4

5

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
121
Bidding Soon
1,833
All Active Projects
727
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 13, 2024

June 2, 2025

img_map_placeholder

300 Dale St, Edgewater, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.