BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2024 at 7:00 PM

Updated February 21, 2024

Site work and paving for a road / highway in Lake Milton, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project consists of resurfacing portions of the following residential neighborhood located on the westside of Lake Milton, just south of Mahoning Avenue: 1. FOREST STREET: Mill 1" and fill with 2" of asphalt. Length is 2,260 ' x variable 15 ' to 20 ' wide from Mahoning Avenue to Bayview Avenue. The two S-bends will be widened with full depth pavement. Full depth asphalt pavement removal & replacement in some areas is also required due to roadway condition. 2. BAYVIEW AVENUE: Mill 1" and fill with 2" of asphalt. Length is 480 ' x 15 ' wide from Forest Street to County Line Road. The radial returns at County Line Road will be widened with full depth pavement. 3. GROVE AVENUE: Fill with 1"of compacted screened grindings and top off with " of compacted screened grindings. Length is 800 ' x 14 ' wide from Forest Street to County Line Road. 4. MAPLE STREET: Fill with 1" of compacted screened grindings and top off with " of compacted screened grindings. Length is 540 ' x 14 ' wide from Forest Street to County Line Road. Engineer = s Construction Cost Estimate: $250,800.00 Project will not commence until May 1, 2024 and be completed no later than August 1, 2024

Post-Bid

Roads / Highways

Public - City

Paving, Site Work

37

7

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
132
Bidding Soon
2,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

May 1, 2024

Project location map

Multiple Locations, Lake Milton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.