BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lake Milton, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project consists of resurfacing portions of the following residential neighborhood located on the westside of Lake Milton, just south of Mahoning Avenue: 1. FOREST STREET: Mill 1" and fill with 2" of asphalt. Length is 2,260 ' x variable 15 ' to 20 ' wide from Mahoning Avenue to Bayview Avenue. The two S-bends will be widened with full depth pavement. Full depth asphalt pavement removal & replacement in some areas is also required due to roadway condition. 2. BAYVIEW AVENUE: Mill 1" and fill with 2" of asphalt. Length is 480 ' x 15 ' wide from Forest Street to County Line Road. The radial returns at County Line Road will be widened with full depth pavement. 3. GROVE AVENUE: Fill with 1"of compacted screened grindings and top off with " of compacted screened grindings. Length is 800 ' x 14 ' wide from Forest Street to County Line Road. 4. MAPLE STREET: Fill with 1" of compacted screened grindings and top off with " of compacted screened grindings. Length is 540 ' x 14 ' wide from Forest Street to County Line Road. Engineer = s Construction Cost Estimate: $250,800.00 Project will not commence until May 1, 2024 and be completed no later than August 1, 2024

Post-Bid

Roads / Highways

Public - City

Paving, Site Work

37

7

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
82
Bidding Soon
1,249
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Lake Milton, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.