BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2024 at 8:00 PM

Updated March 26, 2024

Site work, new construction and renovation of a detention facility in Coupeville, Washington. Completed plans call for the construction of a detention facility; for the renovation of a detention facility; and for site work for a detention facility.

Jail Second Floor Tenant Improvements Description: the Project Generally Consists of 1,182 Square Feet of Renovation Work Inside an Occupied Jail Corrections Building Consisting of Approximately 24,650 Square Feet of Gross Area Located at 503 North Main Street in Coupeville, Washington. The Existing Building Was Originally Designed in 1982 Under the 1979 Ubc Code and Built in 1983. The Building Consists of a 2-story Concrete Structure With a Partial 2,140 Square Foot Basement. The Renovation is Limited to Structurally Minor Interior Modifications Only Within the Existing Gross Floor Area of the Building, to Be Occupied Solely by the Island County Sheriff's Department. Additional Description: Project Scope includes: o Protection of the current facility until new occupancy is achieved; o Construction of new room partitions, window infills, and detention doors and frames; o Electrical renovations in association with desired work above. Est. Completion Date: Aug. 30, 2024 Site Directions: Public Entry through second floor access off west side of Central Street.

Post-Bid

Jails / Prisons

$225,000.00

Public - County

New Construction, Renovation, Site Work

18

2

16

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
126
Bidding Soon
3,168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

April 27, 2024

Project location map

503 N Main St, Coupeville, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.