Published March 11, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Norristown, Pennsylvania. Completed plans call for the renovation of a municipal facility.

The Work of Project is defined by the Contract Documents and consists of the following: 1. Project scope includes an interior renovation to a portion of the first and second floors to be utilized as a temporary swing space. The areas noted for the renovation will not be occupied during this renovation but surrounding areas of the first and second floors will remain occupied. 2. Work is to be accomplished while allowing for continuous occupancy of the building. Work includes active participation in the management and coordination of construction under ALL Contracts and move activities by the Owner - all with the intent to minimize disturbance to building occupants. Type of Contract: 1. Project will be constructed under coordinated, concurrent multiple contracts. See Section 011200 "Multiple Contract Summary" for a description of work included under each of the multiple contracts. Contracts for this Project include the following: a. General Construction b. Mechanical (HVAC) Work c. Fire Protection and Plumbing Work d. Electrical Work Bid Security shall be made payable to the Owner, in the amount of 10 percent (10%) of the Base Bid plus the cost of all alternates. Security shall be either a CERTIFIED CHECK, BANK CASHIERS CHECK or BID BOND issued by a Surety licensed to conduct business in the Commonwealth of Pennsylvania. The Owner reserves the right to approve the sufficiency of the required bid security. A Bid shall be rejected unless accompanied by a Bid Security. Bid Security shall be in the form of a certified check, certified bank treasure's check or certified bank cashier's check payable to the Owner or a Bid Bond in the form set forth in the Bidding Documents, naming as payee and obligee, Montgomery County PERFORMANCE BOND AND PAYMENT BOND: A. Within ten (10) days of receipt of the Notice of Intent to Award, the successful Bidder shall furnish a Performance Bond and a Payment Bond on the forms provided in the Bidding Documents, each in the amount of one hundred percent (100%) of the Contract Sum. The cost of the Performance Bond and the Payment Bond must be included in the bid amount. B. The Attorney-in-Fact who executes the Performance and Payment Bonds on behalf of the surety shall affix to the Performance and Payment Bonds a certified and current copy of its Power of Attorney, authorizing said Attorney-in-Fact to act on behalf of the surety. The Power of Attorney must be dated the same day as the Performance and Payment Bonds and both shall have affixed the raised corporate seal of the surety. Deadline to submit Questions Jan 25th 2024, 11:00 AM EST DISQUALIFICATION AND REJECTION OF BIDS: A. The Owner reserves the right to disqualify Bids, before or after opening, upon evidence of collusion with intent to defraud or other illegal practices upon the part of the Bidder. B. The Owner has the right to reject bids, which are not responsive, and to not award to any bidder which is deemed to be not responsible. C. The Owner expressly reserves the right to reject all bids in the best interest of the County.

Award

Municipal

$46,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Static-Control Resilient Flooring, Carpeting, Tile Carpeting, Acoustic Treatment, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
250
Bidding Soon
4,183
All Active Projects
1,974
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

OMP Swing Space Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.