BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the renovation of a transportation facility; and for site work for a transportation facility.

This project provides for: modifications on Concourse B and Concourse C to allow for larger aircrafts. The work will require removal and replacement of associated electrical feeds to the equipment to comply with current electrical codes and MAC standards. The installation of steel guide posts around newly installed electrical control panels are also included in this project. Building architectural improvements are also included in the project. Site work includes concrete removal and restoration, and pavement marking. Approximate quantities of major items of work are as follows: Passenger Boarding Bridge Relocation 5 EA Fixed Walkway 95 LF Passenger Boarding Bride/Walkway Caissons 2 EA Concrete Pavement 2,000 SY Preconditioned Air Unit / 45-Ton 1 EA Ground Power Unit 1 EA Pavement Marking 1 LS Electrical Distribution 1 LS Doc Notes: Registering as a Plan holder is recommended for all prime contractors and subcontractors as Plan holders will receive automatic notice of addenda and other contract document updates via Electronically. To access the electronic bid form, download the project documents and click on the online bid button at the top of the bid advertisement page. For this project, bids will ONLY be received and accepted via the online electronic bid service . To access the electronic bid form, download the project documents and click on the online bid button at the top of the bid advertisement page. Prospective bidders must be on the Plan holder list through electronically for bids to be accepted. The goal of the MAC for the utilization of Targeted Group Businesses on this project is 8.0%. Construction includes mobilization, miscellaneous removals, PBB Relocation, fixed walkway installation, preconditioned air equipment installation, ground power equipment installation, PBB electrical system modifications, and PBB security system upgrades. Site work includes concrete removal and restoration, fuel system modifications, and pavement marking. Every request for such an interpretation shall be made in writing to TKDA. 444 Cedar Street, Suite 1500, St. Paul, Minnesota 55101-2140. Any inquiry received (7) or more days prior to the time for opening of bids will be considered

Bid Results

Transportation Terminals

$5,524,234.00

Public - State/Provincial

Renovation, Site Work

116

23

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
790
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2024

April 29, 2024

img_map_placeholder

To Be Determined, Minneapolis, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.