BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Alameda, California. Completed plans call for site work for a road / highway.

Please direct any Project questions to Aaliyah Douglas at (510) 747-7941 or adouglas@alamedaca.gov. The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the removal of existing striping and markings in conflict with proposed striping and markings, refresh of existing striping and markings not in conflict with proposed striping and markings, installation of proposed striping and markings, and all associated traffic control and sign installation along Webster Street. This Project is situated on the following City streets: Webster Street between Central Avenue and Lincoln Avenue. Approximate cost of construction: $93,943.00 There will be no prebid meeting for this Project. The Contractor shall begin Work no later than five working days following the start date specified in the Notice to Proceed, which may be hand delivered or sent by email. The Contractor shall complete all Work on the Project within 20 Working days after the start date. The Contractor, and all Subcontractors, shall pay all workers not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations ("DIR"), State of California, for the Work performed, pursuant to sections 1770 et seq. of the California Labor Code. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by the DIR, are on file at the City. Prevailing wage rates are also available online Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. Pursuant to Public Contract Code ("PCC") section 4104, no contractor or subcontractor shall be qualified to bid on, or be listed in a bid proposal unless currently registered to perform public work pursuant to Section 1725.5. No bids will be accepted from a Contractor who has not been licensed in accordance with Business and Professions Code section 7000 and following. The General Contractor shall possess a valid Class A or C-32 construction license issued by the California Contractors State License Board for this Project.

Award

Roads / Highways

$158,907.00

Public - City

Site Work

9

9

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
87
Bidding Soon
1,905
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Alameda, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.