BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Woodland Park, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000340579 Job Location City of Woodland Park Interlocking Concrete Paver Road Repair Scope of Work This work shall consist of furnishing all labor, materials and equipment to replace interlocking concrete pavers on the following existing City Streets: -Spacious Skies Dr -Regal Way -Thunder Ridge Dr This work shall consist of Demolition, removal, loading, haul, and disposal of existing Pavers, replacement/rehabilitation ofsubgrade and roadbase material, removal of tree roots within the top 6" of the subgrade, and preparing and compacting the subgrade and installing new pavers. 1. Removal of Existing Broken Pavers The areas to be repaired/replaced shall be cut out and removed leaving neat straight edges. All removed material shall become the property of the Contractor and shall be disposed of properly. Prior to removal the City will mark out the limits of the patch; the Contractor shall remove only the marked area. The City will not pay for any additional removal, and the Contractor shall correct any such removal at the Contractor's expense. 2. Acceptable Methods of Replacment and Repair Acceptable methods for the installation of Paver replacment and repairshall include, but not be limited to, the use of hand setting, to uniformly set the paver materials. The subgrade and edges of the area to be repaired/replaced shall be adequately prepared and stabalized to City of Wodland Park specifications prior to install. Compaction of the pavers shall be completed in uniformly conform to the City of Woodland Park Design and Construction Standards of the ASCE. 3. Method of Measurement and Payment Payment will be made on field measured installed square yard basis for Pavers, except that the area will be marked and measured prior to construction. Payment shall be made for removing existing Pavers, subgrade and roadbase material, preparing subgrade and replacing Pavers. Paver patching and shall be full compensation for all work necessary to complete the item. 4. Methods of Traffic Control In accordance with CDOT, Subsection 630.09 through Subsection 630.13, Construction Zone Traffic Control - Construction Requirements, except as modified herein. METHOD OF HANDLING TRAFFIC Bid Intent Optional Bid Intent Deadline 02/09/2024 5:00 PM MT Question Acceptance Deadline 02/23/2024 at 5:00 PM MT Questions are submitted online Yes General Requirements - Certification/Training - Installation Required - Insurance Required - License Required - Warranty Information Required Bonding Requirements - Performance Bond 50 % - Labor and Materials Bond 50 % - Payment Bond 50 %

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
88
Bidding Soon
1,421
All Active Projects
581
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 29, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Woodland Park, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.