BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a playground / park / athletic field in Wauconda, Illinois. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Work will include site preparation, temporary soil erosion and sediment control measures, site clearing, earthwork, storm utilities, asphalt mill and resurface, color coating and striping, concrete paving, curbs and footings, chain link fencing and gates, sport court equipment installation, fitness equipment installation, poured-in-place rubber surfacing, landscape planting, and turf grass seeding. All bidders will be required to submit proof of Bid Security in the form of Bid Bond, Certified Check, or Cashier's Check in the amount of 10% of the Base Bid, payable to the Wauconda Park District. The successful bidder, as determined by the Wauconda Park District, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages for the locality of the Wauconda Park District, to each laborer worker or mechanic needed or used to complete the work as detailed in the contract to be let. The Wauconda Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Wauconda Park District. The Wauconda Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed to Lacey Lawrence, Hitchcock Design Group at llawrence@hitchcockdesigngroup.com or 630.961.1787. This project is being financed, in part, with funds from the Illinois Department of Natural Resources, "Open Space Land Acquisition & Development" (OSLAD) grant program. Work must comply with grant requirements.

Award

Playgrounds / Parks / Athletic Fields

$685,346.00

Public - City

Paving, Site Work

18

16

6

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
126
Bidding Soon
2,180
All Active Projects
958
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 15, 2024

img_map_placeholder

124 Osage St, Wauconda, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.