Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 9, 2024 at 7:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
West 50th Street Improvements. The Edina Housing & Redevelopment Authority will meet at 7:30 a.m., Thursday, March 14, 2024, to consider said bids. The following are approximate major quantities. Description Qty Unit Excavation - Common (Cv) (P) 4,275 C Y Aggregate Base (Cv) Class 5 5,000 Ton Type Sp 9.5 Wearing Course Mix (3;b) 700 Ton Sheet Pile Retaining Wall 9,000 S F Rc Pipe Sewer 1,066 L F Steel Baffle Plate 1 Each 12" Watermain Ductile Iron Cl 52 880 L F Concrete Curb & Gutter Design B618 1,819 L F Traffic Control Signal System 1 Sys Sodding Type Lawn 811 S Y Perennial No 1 Cont 99 Plt W 50th Street from Grange Road to 250 feet east of Dale Drive and Grange Road from W 50th Street to TH 100 off ramps Please contact the following people for questions on: BIDDING William Bauer, SEH - 319.450.8732 or wbauer@sehinc.com CONSTRUCTION William Bauer, SEH - 319.450.8732 or wbauer@sehinc.com ADMINISTRATIVE William Bauer, SEH - 319.450.8732 Chad Millner, City of Edina - 952.826.0318 All questions regarding the Contract Documents are to be submitted to the Engineer in writing. Additions, revisions, corrections and/or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda posted by the Engineer to the QuestCDN website referenced in the Advertisement for Bids, and emailed to plan holders in accordance with their notifications settings assigned to their QuestCDN account. Quest VirtuBid will not allow a submittal of a bid without properly acknowledging any addenda. Responses not deemed necessary or within too short of time period to the receiving of bids may not be issued. Only questions responded to by Addenda will be binding. Oral interpretations to the Contract Documents which are available to the Bidder will be without legal effect. The Engineer's estimate of quantities as shown in the bid will be used as a basis of calculation upon which the award of contract will be made, but these quantities are not guaranteed to be accurate and are furnished without any liability on the part of the City.
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2024
April 8, 2024
W 50th St, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Feb 06 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Apr 09 2020
Minneapolis, MN
Bid Date: Feb 21 2019
Minneapolis, MN
Bid Date: Mar 01 2024
Minneapolis, MN
Bid Date: Mar 05 2024
Minneapolis, MN
Bid Date: Feb 27 2024
Minneapolis, MN
Bid Date: Feb 29 2024
Minneapolis, MN
Bid Date: Feb 28 2024
Minneapolis, MN
Bid Date: Feb 14 2024
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Feb 16 2024
Minneapolis, MN
Bid Date: Feb 15 2024
Minneapolis, MN
Bid Date: Feb 22 2024
Minneapolis, MN
Bid Date: Feb 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.