BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work for a water / sewer project in High Point, North Carolina. Conceptual plans call for site work for a water / sewer project.

As of June 6, 2026, this project has been cancelled. Pursuantto N.C. Stat. Sec. 143-128.1(A), the City of High Point,North Carolina isseeking proposals from qualified design firms interested in providing design services for the City of High Point W. Green Drive Stormwater Infrastructure Improvements project. The site of this work will be along W. Green Drive from S. Main Street to W. Taylor Avenue (approximately 3/4 mile). The intent of this RFQ is to select a Design Firm, by Qualifications-Based Selection (QBS) to provide design services for this project. It is advantageous for the design firm to have experience in designing and constructing systems related to reducing, redirecting, infiltrating, or treating stormwater runoff. In April 2023, the City of High Point (City) successfully applied for a $5 million Local Assistance for Stormwater Construction Grant (LASII grant) from the North Carolina Department of Environmental Quality's (NCDEQ's) Division of Water Infrastructure (DWI). This is a project funded by the American Rescue Plan Act (ARPA) and is administered according to all applicable federal and state guidance for ARPA funds, including. The City seeks qualified firms to provide services including design, construction, engineering and inspection (CEI) services for an ARPA-funded project. The total project budget for the City of High Point W. Green Drive Stormwater Infrastructure Systems project is anticipated to be $5,000,000 for the entire project, turnkey, including all costs and fees. All costs include site and building construction related expenses; architectural, programming, design, construction related services; testing services; public jurisdiction fees and charges; permits, signage, reasonable design and construction contingency amounts, and other building related professional service fees necessary to fully build the Owner's project. Due to ARPA's fiscal deadlines, the fully constructed project must be delivered by the end of December 2026. Any questions regarding this RFQ requiring responses prior to due date are to be submitted in writing by no later than February 12, 2024, by 2:00 PM to the attention of: Candy Harmon candy.harmon@highpointnc.gov

Project Abandoned

Water / Sewer

$5,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
171
Bidding Soon
2,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2025

Project location map

W Green Dr, High Point, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.