Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 15, 2025 at 7:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Millbrae, California. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.
The work to be performed under this contract consists of the following items of work and as further described in the solicitation documents: construction surveying, demolition, fine grading, landscaping, and installation of lawn, trees, plants, playground station and area, site utilities, irrigation sprinkler system (2-wire), basketball courts, dog play equipment, shade structure, fences, and gates. Note: For the playground equipment and area, the Contractor is required to use the subcontractor identified on the Plans. A certified check or corporate surety bond of not less than ten percent (10%) of the basis of award amount must accompany each proposal. The basis of award is the Total Bid Amount. A certified check or corporate surety bond of not less than ten percent (10%) of the basis of award amount must accompany each proposal. The basis of award is the Total Bid Amount. Licensed Required: CSLB Class A General Engineering or C-27 Landscaping. Time of Completion shall be One Hundred Twenty (120) calendar days after issuance of the Notice to Proceed. Liquidated damages for failure to complete the work within the specified time are specified in the Contract Documents. The deadline for questions related to the bid is Friday, February 14, 2025, at 5:00 pm. The Millbrae City Council reserves the right to accept or reject any and all bids, alternate bids, or unit prices and/or waive any irregularities in any bid received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimate is $1,290,000 to $1,580,000.
GC Bidding
Playgrounds / Parks / Athletic Fields
$1,580,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
April 28, 2025
Lerida Ave, Millbrae, CA
Related To This Project
Millbrae, CA
Bid Date: Jun 20 2024
Millbrae, CA
--
Millbrae, CA
Bid Date: Apr 12 2024
Millbrae, CA
Bid Date: Apr 18 2024
Millbrae, CA
Bid Date: May 02 2024
Millbrae, CA
Bid Date: May 23 2024
Millbrae, CA
Bid Date: May 31 2024
Millbrae, CA
Bid Date: Mar 07 2024
Millbrae, CA
Bid Date: Oct 30 2024
Millbrae, CA
Bid Date: Dec 14 2023
Millbrae, CA
--
Millbrae, CA
Bid Date: Nov 29 2023
Millbrae, CA
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.