BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Norridgewock, Maine. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of February 29, 2024, bids were rejected. Project will be rebid April 2024.** Work under this contract will be located within the public ROW of Winding Hill Road in the Town of Norridgewock, Maine. The Winding Hill Road Site is located at (N 44.74600, W -69.86450 Work Description The work involves removal and disposal of an existing 72-inch diameter corrugated metal culvert and installation of precast concrete footers; installation of a 19 foot span, 49'6" long aluminum arch open bottom culvert); stream bed reconstruction; backfill and slope reinforcement; pavement installation; and site restoration. Contractor shall be responsible for installing and maintaining all specified in-stream and adjacent fish protection, turbidity control, and erosion and sediment control measures shown on the Plans. Contractor shall also install and maintain dewatering activities shown on the Plans as necessary to perform the work in "dry" conditions to the greatest extent possible. No proposal may be withdrawn for at least 30 days after receipt of proposals. The project involves the removal of an existing culvert and replacement with open bottom, aluminum arch with precast concrete footers and associated work as shown on the plans. The Project Manual will be available June 16, 2024. The project drawings include: Bombazee Brook Stream Crossing Drawings C-501, and C-502 dated March 15, 2024 by St.Germain. The project's in-stream work shall be completed between July 15, 2024 and September 30, 2024. All in-stream work shall be completed between July 15, 2024 and September 30, 2024. Other associated work shall be completed by October 31, 2024. The Town reserves the right to accept or reject any or all bids and to waive formalities. Any questions concerning these specifications shall be addressed to Johnathan Malloy, P.E. (207-857-7368) johnathanm@stgermain.com. All bids must be accompanied by a duly signed and executed bid bond for the amount of 5% of the total bid. The Project Manual will be available June 16, 2024. Copies of the Project Manual may be obtained upon payment of a non-refundable fee of $25.00 per set and will be mailed from the offices of StGermain, located at 846 Main Street, Westbrook, Maine. Credit card payments are accepted (contact StGermain by phone at 207-591-7000 to coordinate credit card payments). The work involves removal and disposal of an existing 72-inch diameter corrugated metal culvert and installation of precast concrete footers; installation of a 19 foot span, 49ft6in long aluminum arch open bottom culvert); stream bed reconstruction; backfill and slope reinforcement; pavement installation; and site restoration. Contractor shall be responsible for installing and maintaining all specified in-stream and adjacent fish protection, turbidity control, and erosion and sediment control measures shown on the Plans. Contractor shall also install and maintain dewatering activities shown on the Plans as necessary to perform the work in dry conditions to the greatest extent possible.

Final Planning

Bridges / Tunnels

$300,000.00

Public - City

Paving, Site Work

5

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
40
Bidding Soon
796
All Active Projects
208
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 16, 2024

August 15, 2024

September 30, 2024

img_map_placeholder

Winding Hill Rd, Norridgewock, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.