BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Modesto, California. Completed plans call for site work for a water / sewer project.

**As of May 2, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** The purpose of this project is to address water quality issues associated with the Jennings Well, which supplies potable water to the City's Jennings Wastewater Treatment Plant. The Jennings Well has a history of exceeding secondary Maximum Contaminant Levels (MCLs) for various substances, leading to operational challenges. To improve water quality, an evaluation conducted by West Yost Associates recommends implementing a treatment system. This system involves replacing the existing well pump, adding a pressure tank, a water softener, and a packaged reverse osmosis treatment unit. The project aims to ensure that the water quality meets applicable standards and supports the increasing water demands at the Jennings Plant and the City Composting Facility while remaining within the production capacity of the existing well, even with treatment in place. Question Deadline 02/23/2024 Email all questions to: Jennings_Well_Treatment_Improvements_Bid_Questions@docs.ebuilder.net by 4:00 p.m., no later than 7 business days prior to the bid opening. Type of Award Lump Sum Estimated Bid Value $1,700,000.00 Start/Delivery Date TBD Project Duration 140 Working Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements "A" California State Contractor License The City reserves the right to reject any or all bids or to waive any informalities or minor irregularities in a bid. All bids shall be submitted in a sealed envelope and shall be accompanied by cash, cashier's check, certified check, or bidder's bond made payable to the City of Modesto, for an amount equal to at least 10 percent of the amount of said bid, and no bid shall be considered unless such cash, cashier's check, certified check or bidder's bond is enclosed therewith. Email all questions to: Jennings_Well_Treatment_Improvements_Bid_Questions@docs.ebuilder.net by 4:00 p.m., no later than 7 business days prior to the bid opening. The Payment of Prevailing Wages is Required on this Project.

Bid Results

Water / Sewer

$1,135,700.00

Public - City

Site Work

31

26

4

7

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
94
Bidding Soon
1,818
All Active Projects
680
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 6, 2024

img_map_placeholder

7007 Jennings Rd, Modesto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.