Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Huntsville, Alabama. Completed plans call for the renovation of a municipal facility.
Substantial completion by September 30, 2024 The intent of these General Conditions is to outline in general the rights and responsibilities of the Owner, Owner and Contractor, and to establish policies and procedures to be followed during the execution of this Contract. While the Sections are grouped together according to the parties or responsibilities to which they address most directly, it should be noted that these groupings are for convenience of reference only and do not necessarily mean that the responsibilities of other parties to the Contract are not discussed in these or other Sections. These groupings have no bearing whatsoever on the interpretation of the Specifications. Also included in these General Conditions are the general requirements that must be satisfied before the work covered by the Contract can be considered complete. Any modifications to these conditions, which are special to the particular project under consideration, will be made in the Special Conditions or Addenda. All mentions or references to documents or specifications shall be the latest edition or revision thereof If required per Bid Letter, e bids must be accompanied by a cashiers check drawn on an Alabama bank or a bid bond executed by a surety company dully authorized and qualified to make such bonds in the State of Alabama payable to the City of Huntsville, Alabama, d/b/a Huntsville Utilities for an amount not less than five percent (5%) of the bidders bid, but in no event more than ten thousand and no/100 ($10,000.00) Any successful Bidder, upon their failure or refusal to execute and deliver the Contract and the required Performance Bond, Payment Bonds, insurance documents and any other bonds which may be required by the Contract Documents, required within fifteen (15) days after they have received notice of the Owners acceptance of their bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with their bid. Exceptions to this requirement will be considered upon written request. Bids written in pencil will not be accepted. Unsigned bids will not be accepted The Bid must be received in the format specified. The Bidder may submit supplemental information on USB Drive submittal. Late bids will not be opened, considered for evaluation, nor returned to the bidder. Incomplete bids will not be considered. Huntsville Utilities reserves the right to consider each item separately. Huntsville Utilities reserves all rights to make advantageous decisions for the betterment of Huntsville Utilities customers. Owner reserves the right to request cost breakdown information and to negotiate any price submitted by bidders. Owner reserves the right to make award to other than the low bidder or to award a subcontract based upon the original price proposals without negotiation, provided that the contract is awarded to the lowest, responsible and responsive bidder. Bidders are encouraged to provide their most favorable price when bidding. All blank spaces for bid prices must be filled in. The bidder may present alternative proposals and we reserve the right to consider alternative proposals The Owner reserves the right to reject any Proposal not in compliance with the Contract Documents, or to waive any irregularities or informalities at their sole discretion
Post-Bid
Municipal
$405,300.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2024
March 18, 2024
To Be Determined, Huntsville, AL
Related To This Project
Huntsville, AL
Bid Date: Feb 22 2024
Huntsville, AL
Bid Date: Feb 22 2024
Huntsville, AL
Bid Date: Mar 25 2024
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
--
Huntsville, AL
Bid Date: Jul 16 2020
Huntsville, AL
Bid Date: Aug 27 2019
Huntsville, AL
Bid Date: Mar 07 2024
Huntsville, AL
Bid Date: Apr 16 2024
Huntsville, AL
Bid Date: Mar 07 2024
Huntsville, AL
Bid Date: Feb 08 2024
Huntsville, AL
--
Huntsville, AL
Bid Date: Feb 07 2024
Huntsville, AL
Bid Date: Mar 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.