BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Manchester, New Hampshire. Completed plans call for the renovation of a transportation facility.

The City of Manchester, Department of Aviation (hereinafter "the Airport"), will accept Pre-qualification Statements from contractors interested in bidding on upcoming construction projects at Manchester-Boston Regional Airport during calendar year 2024. The projects for which Pre-qualification Statements are being accepted are described below. Project descriptions are representative of the types of projects the Airport is considering at this time and/or other similar projects that may be initiated during this construction season. Contractors who qualify for specific projects shall be considered qualified for any projects the Airport deems to be similar in nature. This project consists of the Design-Build replacement of heating ventilation and cooling (HVAC) equipment that is located in various areas of the Airport terminal building and the terminal access walkway. The D-B project scope is anticipated to include design / procurement / replacement of 3 large air handling units (AHUs) that provide HVAC to the terminal building and 5 roof top units (RTUs) that provide HVAC to the terminal access walkway. The AHUs are located on the terminal roof and service 129,000 SF of terminal space and the RTUs service 17,600 SF of terminal walkway space. The existing equipment age ranges between 20 and 30 years old and will be replaced by new more energy efficient equipment. The project also includes the replacement of the existing building management system and a specialized air conditioning unit for the Airport's IT room. The approximate project cost range is anticipated to be between $7,500,000 and $8,500,000 depending on the final scope of work. Contract requirements related to Federal funding will apply. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Only pre-qualified contractors will be afforded the opportunity to bid on Airport projects requiring Pre-qualification. Product/Material suppliers and subcontractors are not required to file for prequalification. Contractors may apply for pre-qualification for any one or more of these projects. Individual projects will not be re-advertised for pre-qualification if they are adequately represented in this legal notice. It is the sole responsibility of the Contractor to be prequalified within the timeframe stated above. Contractors are encouraged to submit statements as soon as possible. Pre-qualified contractors will be notified of all projects for which they have been pre-qualified to bid. The Airport, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, businesses will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity),or age in consideration for an award.

Post-Bid

Transportation Terminals

$8,500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
126
Bidding Soon
2,410
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

July 1, 2024

img_map_placeholder

1 Airport Rd, Manchester, NH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.