BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2024 at 7:00 PM

Updated March 6, 2024

Site work for a civil project in East Wenatchee, Washington. Completed plans call for site work for a development; and water / sewer project.

East Wenatchee for construction of the Grant Road Oil Treatment and Bioretention project. Work to be performed includes: storm sewer pipe, watermain, a bioretention pond, and related work in accordance with the contract plans, special provisions, and the WSDOT Standard Specifications. Order of magnitude is approximately $1,000,000 Time for completion of the work is limited to 40 working days. Each bid proposal shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, postal money order, or surety bond in an amount equal to at least 5 percent of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance and payment bond within the time stated in the Specifications, the bid proposal deposit shall be forfeited to the City of East Wenatchee. The City of East Wenatchee reserves the right to reject any or all bids and to waive irregularities in the bid or the bidding. Project occurs between Grant Road and Pace Drive on Highline Drive in East Wenatchee , WA.

Award

Conservation and Development

$883,193.00

Public - City

Site Work

23

6

8

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
8
Bidding Soon
292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

April 1, 2024

Project location map

Highline Dr, East Wenatchee, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.