Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Site work and paving for a mixed-use development in East Wenatchee, Washington. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of September 24, 2025, the project has completed around 60% of the design work. The project requires additional funding before it can be bid out openly. Construction is expected to begin in 2027. *Previous solicitation listed below for reference: The CITY OF EAST WENATCHEE solicits proposals from consulting firms with expertise in civil engineering and design. Consultants will be considered for the following project. The work to be performed by the Consultant consists of preparing preliminary engineering plans, specifications, and estimates (PS&E) for the construction of street improvements on North Kentucky Ave. This project is pided into two phases. Phase 1 is from Grant Road to 5th Street NE. Phase 2 is from 5th Street NE to 10th Street NE. The major features of the project are as follows: * Phase 1 consists of approximately 2660 feet of improvements including roadway reconstruction, curb, gutter, sidewalk, illumination, and enhanced pedestrian facilities. The intersections of 3rd Street NE and 5th Street NE will be evaluated for possible safety enhancements. The Douglas County Sewer District is expected to have utility upgrades in this phase that may align with this project. Phase 1 shall reach 90% PS&E. * Phase 2 consists of approximately 3200 feet of improvements, along with the intersection of 8th Street NE being evaluated for possible safety enhancements. This phase shall reach 30% PS&E. Required stormwater retention and treatment locations shall be identified as a part of this effort. If stormwater mitigation is best achieved within phase 1's project area, the phase 1 stormwater facilities should be sized to meet future treatment and retention requirements. * Right of Way needs may be identified within Phase 1's project area. Right of Way Acquisition may be supplemented to the initial agreement as needed. * Complete stormwater collection, treatment, and conveyance system in accordance with current NPDES requirements. * Americans with Disabilities Act (ADA) compliance. * Environmental planning, permit applications, and NEPA approval. * The City has received design and right of way funding through the Public Works Board. Questions regarding this project should be directed to: Garren Melton, Public Works Manager at gmelton@eastwenatcheewa.gov. The City of East Wenatchee is an equal opportunity and affirmative action employer. Minority- and women-owned firms and Section 3 business concerns are encouraged to submit a proposal. Persons with disabilities may request this information be prepared and supplied in alternate forms by calling the City Clerk at 509-884-9515.
Design
Roads / Highways
$4,000,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2027
N Kentucky Ave, East Wenatchee, WA
Related To This Project
East Wenatchee, WA
--
East Wenatchee, WA
--
East Wenatchee, WA
Bid Date: Apr 09 2024
East Wenatchee, WA
Bid Date: Apr 17 2024
East Wenatchee, WA
Bid Date: Apr 25 2024
East Wenatchee, WA
Bid Date: May 13 2024
East Wenatchee, WA
--
East Wenatchee, WA
Bid Date: May 16 2024
East Wenatchee, WA
Bid Date: Mar 04 2024
East Wenatchee, WA
Bid Date: Mar 11 2024
East Wenatchee, WA
Bid Date: Mar 04 2024
East Wenatchee, WA
Bid Date: Mar 04 2024
East Wenatchee, WA
Bid Date: Mar 14 2024
East Wenatchee, WA
Bid Date: May 02 2019
East Wenatchee, WA
Bid Date: Mar 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
