BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Greeley, Colorado. Completed plans call for site work for a water / sewer project.

As of March 21, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Reference Number 0000342067 Question Acceptance Deadline 02/20/2024 03:00 PM MT Questions are submitted online No, Prospective offerors may make written inquiries by e-mail before the written inquiry deadline concerning this RFP to obtain clarification of requirements. No inquiries will be accepted after the deadline. Inquiries regarding this RFP (be sure to reference RFP number) should be referred to: E-Mail: Purchasing@greeleygov.com Notice of Award (tentative) March 5th, 2024 A section of the Poudre River located north of the City's Poudre Ponds site between 25th Avenue and 35th Avenue has been eroding from spring runoffs. There are temporary repairs that need to be removed and a permanent structure constructed to mitigate the erosion and protect city assets including the Poudre Trail and Poudre Pond's (Pond A) Slurry Wall. In 2021, this project location experienced a bank failure on the southern bank (river right) during spring runoff. Contractors protected the remaining bank that summer with temporary large sandbags, followed by an eco-block wall for more substantial protection in 2022. With the significant runoff season of 2023, the eco block wall was becoming undermined, so contractors added large rip rap to the top and toe of the wall to prevent further erosion of the river bed upstream and under the toe of the wall. This is the current state of the project site. Your proposal must include a project plan (a timeline) with key milestones. The proposal should also discuss how you plan on constructing the river wall and all items outlined below: Construct approximately 600-feet of river wall armoring within the Poudre River located between 25th Avenue and 35th Avenue. Construction will require diverting water from riverbank and dewatering construction area. Removal and stockpiling of temporary repair materials (eco blocks). Removal and offsite disposal of items that may have been placed along the riverbank for bank stabilization, such as car bodies. Landscaping including planting willows along the boulder wall within the river channel and restoration of disturbed areas outside the river channel. Force Account Work: If the in-channel work cannot be completed by May 15, 2024, the force accounts will be used to pay for making temporary repairs to shore up the riverbank before and during the runoff as directed by the city's Project Manager., Coordinate with the City's project consultant (Otak) for permitting needs, including: Clean Water Act 404 permits City floodplain development permit Storm water and other City permits (responsibility of the contractor) Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City reserves the right to cancel this RFP at any time, without penalty.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

37

16

2

5

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
109
Bidding Soon
1,573
All Active Projects
670
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 27, 2024

March 28, 2024

May 15, 2024

img_map_placeholder

924 N 35th Ave, Greeley, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.