Site work for a road / highway in Santa Clara, California. Completed plans call for site work for a road / highway.

DESCRIPTION OF WORK. The Work includes but is not limited to: Installing the extension required to tie the new Bowers Avenue Junction Substation into SVP's existing 60kV Center Loop. The tie-in includes the installation of two (2) tubular steel poles, including framing for future 115kV second circuit, removing a portion of existing double bundle 945 kcmil conductor and stringing of new conductor. The transmission conductor is bundled 715 kcmil ACCR "Stilt" and includes the framing and installation of two (2) direct embedded light duty steel poles. Contractor shall provide all labor, equipment, supervision, and specified materials needed for a completed project. CONTRACT TIME. Work for the Bowers Avenue Junction Project shall reach Substantial Completion within one hundred twenty (120) Working Days from the date when the Contract Time commences to run. The Work shall reach Final Completion within one hundred thirty (130) Working Days from the date when the Contract Time commences to run. See Document 00050, References and Definitions, for definitions of Substantial Completion and Final Completion. REQUIRED CONTRACTOR'S LICENSE(S). Both California "A" and "C-10" contractor's licenses are required to bid this contract. Joint ventures must secure a joint venture license prior to award of this Contract. REQUIRED CONTRACTOR AND SUBCONTRACTOR'S REGISTRATION. The Bidder and subcontractor(s) must be registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposed only under Labor Code Section 1771.1(a)]. The Bidder or subcontractor(s) may not be awarded the Contract unless registered as noted above. City specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work. Question Deadline 03/07/2024 at 3:00 PM PT City may not answer questions received less than ten (10) Calendar Days prior to the date for opening Bids.

Award

Roads / Highways

$505,550.00

Public - City

Site Work

12

16

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
69
Bidding Soon
1,466
All Active Projects
633
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

June 14, 2024

img_map_placeholder

Bowers Ave, Santa Clara, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.