BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ault, Colorado. Completed plans call for site work for a water / sewer project.

The Project is in Ault, Colorado between Wykert Subdivision First and Second Filing known as the Wykert Alley. This project consists of the construction of approximately 1,035 LF of 24" RCP, 47 LF of 12" RCP, 4 EA. Std. Precast Manholes, and other miscellaneous work. All bid proposals must be on the form provided and must be accompanied by a certified check or bank draft, payable to the order of the Town of Ault negotiable U.S. Government bonds (at par value) or a satisfactorily Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid. Checks accompanying bids not accepted will be returned to the bidders. The selected Contractor will be required to furnish a 100% Contract Performance Bond and a 100% Contract Payment Bond to cover the execution of the Work which shall be in conformity with the Form of Bonds contained in the Specifications and for the Contract Amount. Questions and Clarifications shall be submitted to Ryan Banning, P.E. rbanning@northernengineering.com . The Work, to complete the ditch crossing shall be completed by May 1, 2024. All other Work once started, will be substantially completed within 30 Days consecutive calendar days after the Notice to Proceed and complete and ready for final payment within 10 Days consecutive calendar days past substantial completion. All work shall be completed no later than August 1, 2024. No bids shall be withdrawn after the opening of the bids without the consent of the Town of Ault, for a period of sixty (60) days after the scheduled time of opening bids. The Town of Ault reserves the right to reject any or all bids, to waive any informalities in bids, and to accept the bid that, in the opinion of the Town of Ault, is in the best interests of the Town of Ault. Pre-bid description: Bidders are encouraged to attend and participate in the conference.

Bid Results

Water / Sewer

$433,515.00

Public - City

Site Work

16

14

6

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
39
Bidding Soon
894
All Active Projects
376
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Ault, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.