BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Morristown, New York. Design plans call for the construction of a educational facility.

https://www.spartnerships.com/pipeline/2024/government-contracting-pipeline-03-20-2024.html New York town to use $17 million to improve school infrastructure The Morristown Central School District (MCSD) in New York will kickstart a $16.9 million capital improvement project (CIP) to enhance safety and security measures, reinforce building infrastructure and address space adequacy. Construction will begin in 2025. The scope of work will include addressing inadequate space by reconstructing the kitchen and serving area. In addition, the district will renovate the cafeteria and add a dedicated food storage space and loading dock for deliveries. Plans include renovating the existing STEM classroom into an industrial arts and STEM suite for more programming and activities. MCSD will also replace seating and improve acoustics in the existing gymnasium. The district will expand the fitness center, nurse’s office and install an exterior entry to improve community access. MCSD will expand the school’s stage and convert it into a dedicated performance area. The district will add a choral music classroom, allowing students to practice without sharing the space with the gymnasium. The district will update the school’s infrastructure by installing HVAC and boiler systems. Plans also include expanding parking lots, restoring masonry and performing site drainage maintenance in the school’s transportation building. The school will build a restroom that can be accessed from the exterior of the building. MCSD will improve school safety and security by replacing all classroom doors and locks. In addition, the district will replace shared restrooms in the elementary wing. New York State will cover approximately 80% of the project’s cost. MCSD will contribute the remaining funding from capital reserves, available funds and tax levies. (Photo courtesy of the Morristown Central School District.) __________________________________________________ Project work includes safety and security improvements, cafeteria/kitchen improvements, STEM classroom renovations, gym/fitness center improvements, performance stage improvements, building infrastructure improvements. As of February 20, 2024, this project is in the design phase. An architect has been selected for the project. Information regarding the contractor selection has not been disclosed. Construction is not expected to start prior to 2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Educational

$16,900,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
49
Bidding Soon
698
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

img_map_placeholder

408 Gouverneur St, Morristown, NY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.