Site work and paving for a road / highway in Cottage Grove, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 21, 2024, project was awarded to Bituminous Roadways, Inc., in the amount of $1,207,693.20. ** The work includes the construction of approximately: 350 LF Remove and Replace Concrete Curb and Gutter 150 LF 6" DIP Water Main 98,000 SY Bituminous Street Pavement Removal 13,000 TN Bituminous Mixtures 890 SF Concrete Walk and Pedestrian Ramps 120 SY Seed, Fertilizer, Hydraulic Mulch 1,400 LF Pavement Striping Together with numerous related items of work, all in accordance with Plans and Specifications. This is a Mill and Overlay Street Improvement Project and is approximately 5.25 miles in length. The method of reconstruction will be milling and overlaying the wear course pavement, watermain improvements, concrete curb and gutter replacement, concrete sidewalk pedestrian ramp improvements, along with pavement markings and new signage. The City of Cottage Grove has adopted a standard document entitled "Standard Specifications for Utility and Street Construction", dated January 2024, which includes the Procurement and Contracting Requirements and Specifications which are hereby incorporated into the Bidding Documents. Bidders are required to obtain a copy of this standard document once per year. Direct inquiries to Engineer, Andrew Olson at (612) 619-9593. Bid Security in the amount of 5 percent of the amount of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 60 days after the date and time set for the Opening of Bids. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner. Completion- Substantial Completion: August 23, 2024 Final Completion: September 20, 2024 Question Deadline 02/19/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than 10 days prior to the date for Opening of Bids may not be answered.

Award

Roads / Highways

$1,207,693.00

Public - City

Paving, Site Work

23

20

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
83
Bidding Soon
809
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Cottage Grove, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.