BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in The Dalles, Oregon. Conceptual plans call for site work for a water / sewer project.

1. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry so the government can make informed business decisions. We are seeking responses from both large and small business members of industry to include: Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and Veteran Owned Small Business (VOSB). All interested parties are highly encouraged to respond. Reponses to this Sources Sought announcement will be used by the Government to make business decisions and to inform potential future solicitations. The North American Industrial Classification Code (NAICS) for this requirement is: 237990 The related size standard is: $45 Million. Formal Sources Sought Response Due - Wednesday, 21 February 2024 at 3:00 pm PDT. 2. Project Background. The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release. 3. Project Scope. There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks. a. Project objectives: See the draft specifications for project objectives. The specifications are not finalized and may significantly change prior to solicitation. b. Anticipated Construction Schedule: CENWP intends to advertise in May of 2024 and award in August 2024. Construction Contract with estimated construction completion by the end of May 2025. c. Estimated Construction Cost (ECC): The current ECC is between $1,000,000 and $5,000,000. Ref. FAR 36.204 Disclosure of Magnitude and DFARS 236.204 Disclosure of Magnitude. d. Number and Type of Contracts: NWP contemplates awarding one firm fixed-price construction contract. The acquisition strategy decision has not yet been determined. Maximum Small business participation is being sought at both the Prime and subcontracting levels. e. Anticipated Source Selection Process: The expected acquisition method to provide the best value to the government is Best Value. 4. Project Specific Constraints and Challenges: This is a pilot program. The specifications and management controls will incorporate contingencies to minimize risk. This project will also require the purchase of information technology components through the Army's Computer Hardware Enterprise Software and Solutions (CHESS) IT E-Mart. 5. Questions for Industry: a. Is there anything in our specifications that would discourage you from bidding b. Is there anything in our specifications that would cause pricing uncertainty c. Are there any market conditions or industry practices that you feel the government needs to be aware of 6. Submission Instructions. Formal responses to this Sources Sought notice must be submitted electronically (via email) with SUBJECT: Sources Sought - W9127N24R0002 TDA Oil Accountability. Please email Andrea Smothers, at andrea.k.smothers@usace.army.mil, before 3:00 pm Pacific Standard time on 21 February 2024. Interested parties' responses to this Sources Sought shall be limited to six (6) pages. Required Information: a. Firm's name, address, point of contact, phone number, e-mail address, CAGE and Unique Entity ID. b. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged Businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Woman-Owned Small Business (WOSB) to include Economically Disadvantaged Women-Owned Small Business (EDWOSB), Service-Disabled Veteran-Owned Small business (SDVOSB) and at the subcontracting level, Veteran Owned Small Business (VOSB). c. An explanation of the prime firm's capabilities, special qualifications/certifications and equipment and describe the work to be self-performed as it pertains to the proposed work outlined in the Project Scope. d. Firm's Bonding Capability. e. Firm's interest and the likelihood in bidding on the solicitation when it is issued. (Refer to planned advertise and performance dates) f. Responses to the government's questions in paragraph 5 and any other information the contractor feels the government needs to be aware of. Optional Information: Interested firms are also invited to submit the following information to assist the government in making informed business decisions a. A description of work performed under similar project constraints and challenges listed under paragraph 3. b. Project Examples (for Joint Ventures, please include projects completed by the Joint Venture if available): To be considered for a potential set aside strategy, provide a maximum of three (3), minimum of one (1), project(s). These project examples must be similar in size, scope and complexity to the work described in paragraph 3 of this notice, with a description of each project (to include pertinent qualitative and quantitative information about featured scope elements), and include the following: Project Title Contract Number Contract award date Customer name, phone number and email address Prime or Subcontractor Initial contract dollar value Final contract dollar value Initial contract completion date Final contract completion date Customer satisfaction The Government may verify information in CPARS or PPIRS. c. Firm's Joint Venture information if applicable - existing and potential. 7. Disclaimer and Important Notes. a. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. b. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered. You must remain current for the duration of the source selection process to be eligible for award of a Government contract. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
19
Bidding Soon
374
All Active Projects
110
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2025

June 23, 2025

img_map_placeholder

To Be Determined, The Dalles, OR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.