BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Winfield, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The proposed work for the 2024 ROAD PROGRAM consists of hot-mix asphalt surface removal, hot-mix asphalt leveling binder, binder and surface courses, Class D patching, sidewalk removal and replacement, curb and gutter removal and replacement, manhole adjustments, parkway restoration, pavement marking, and approximately 1,800 LF / 0.34 miles of road resurfacing in the Village of Winfield, in accordance with the Plans and Specifications as set forth in the Contract Documents. All BIDS shall be submitted on the forms provided, and shall be accompanied by a Certified Check, Cashier's Check, or Bid Bond, in an amount not less than five percent (5%) of the amount of the Bid, and subject to the conditions provided in the Instructions to Bidders. Question Deadline 02/16/2024 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. The Village of Winfield reserves the right to reject any and or all Bids, to waive any irregularities and informalities. Awards will be made to the lowest responsible Bidder as determined by the Village of Winfield. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the contract throughout, including the Illinois Prevailing Wage Act (Ill. Rev. Stat. Ch. 48, Sects 39s-1-12) and the Illinois Preference Act (Ill. Rev. Stat. Ch. 48, Sects. 2201-2207). GARYS MILL ROAD, BROOKSIDE DRIVE, WASHINGTON AVE, WINFIELD RD, HIGHLAKE PARKING LOT PAVEMENT MARKING PROGRAM AND SIDEWALK PROGRAM

Bid Results

Roads / Highways

$348,779.00

Public - City

Paving, Site Work

12

8

2

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
116
Bidding Soon
1,825
All Active Projects
814
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

May 1, 2024

img_map_placeholder

Multiple Locations, Winfield, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.