BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a museum in Clear Lake, Iowa. Completed plans call for the construction of a museum; and for site work for a museum.

Qualifications are being requested for the following contracts: Bid Package #1 - Cast-in-Place Concrete Bid Package #2 - Hollowcore Supplier Bid Package #3 - Masonry Bid Package #4 - Structural Steel Supplier Bid Package #5 - Roofing, Sheetmetal, and Paver Patio System Bid Package #6 - Door Supplier Bid Package #7 - Aluminum/Glass/Glazing Bid Package #8 - Metal Studs/Drywall/EIFS Bid Package #9 - Acoustical Ceiling Bid Package #10 - Tiling, Resilient Flooring and Carpeting Bid Package #11 - Painting Bid Package #12 - Elevator Bid Package #13 - Fire Sprinkler Bid Package #14 - Plumbing & HVAC Bid Package #15 - Electrical Bid Package #16 - Sitework & Site Utilities See specification Section 01 1213 Summary of Multiple of Contracts regarding complete scope of work description for each Bid Package. Each Bid shall be accompanied by Bid Security, in a separate sealed envelope, in the form of either (1) cash, cashiers check or certified check or certified share draft drawing on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to at least Five (5%) Percent of Project Bid Amount or (2) a Bid Bond executed by a corporation authorized to contract as a surety in the State of Iowa with the amount or penal sum of not less than Five (5%) Percent of Project Bid Amount. The bid security should be made payable to the City of Clear Lake. Such bid security shall be forfeited to the City of Clear Lake as liquidated damages in the event the successful bidder fails or refuses to enter into a Contract within ten (10) days after the Award of Contract and post bond satisfactory to said owner insuring the faithful fulfillment of the Contract pursuant to the provisions of this Notice and the other Contract Documents On-site mobilization and construction shall begin no sooner than April 8, 2024. The Owner requires substantial completion for the project by June 30, 2025 (dependent upon material delivery lead times). The City of Clear Lake reserves the right to reject any or all bids and waive all informality and irregularity in connection therewith if the same is judged to be in their best interests, and to make a selection, including that of any Alternate Bids, that in their judgment is best suited for the purpose intended for the project.

Post-Bid

Museum

$10,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
20
Bidding Soon
290
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 8, 2024

img_map_placeholder

468 N Shore Dr, Clear Lake, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.