Site work for a water / sewer project in Cartersville, Georgia. Completed plans call for site work for a water / sewer project.
**As of April 2, 2024 project was awarded to K.M. Davis Contracting Co., Inc. with an amount $304,692.50.** All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Replies considered necessary by the Engineer will be issued by Addenda mailed or faxed to all parties recorded on Engineer's Bidder's registry as having received the Bidding Documents. Questions received less than ten (10) days prior to the date for opening of Bids may not be answered Construction of Bartow County Water System Improvements The Project Will Consist of Providing All Labor, Tools, Equipment and Incidentals Necessary for Furnishing and Installing a Metered Water Connection to an Existing 16-inch Ductile Iron Watermain Including: One (1) 16-inch Cutin Connection; One (1) Metering Vault With Owner-furnished 10-inch Meter; One (1) Backflow Prevention Vault; All With Related Piping, Fittings, Thrust Blocking, Valves, Appurtenances, and Incidentals, Including Hydrostatic Testing, Flushing, Disinfection, Traffic Control, Erosion Control, Grassing, Restoration, and Clean-up for a Complete and Operational Water Service Connection. The Project Will Be Funded by Local Funds. Payment for the Work Will Be Made on the Basis of Contractor's Periodic Applications-for-payment Processed by the Engineer. Bids must be accompanied by a Bid Bond, or other security authorized by law, in an amount of not less than five percent (5%) of the total base bid. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the Contract Price. In accordance with O.C.G.A. 43-41-1, Bidders must submit a photocopy of their Georgia Utility Contractors License. Contractors shall comply with all provisions of the "Georgia Security and Immigration Compliance Act" (O.C.G.A. 13- 10-91 and O.C.G.A. 50-36-1). The Successful Bidder must certify compliance with all applicable state and federal laws regarding maintaining a drug-free workplace. The right is reserved by the Owner to delay the award of the Contract for a period not to exceed sixty (60) days from the bid opening date, during which time the bids shall remain open and not subject to withdrawal. The Owner reserves the right to reject any or all bids and to waive any and all technicalities or informalities. If an award is made, the award will be made to the responsive and responsible Bidder having the lowest Total Bid.
Award
Water / Sewer
$304,692.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 7, 2024
April 8, 2024
October 5, 2024
To Be Determined, Cartersville, GA
Related To This Project
Cartersville, GA
Bid Date: Mar 15 2024
Cartersville, GA
--
Cartersville, GA
--
Cartersville, GA
Bid Date: Apr 11 2024
Cartersville, GA
Bid Date: May 02 2024
Cartersville, GA
Bid Date: Mar 27 2024
Cartersville, GA
Bid Date: Apr 19 2024
Cartersville, GA
Bid Date: Apr 26 2024
Cartersville, GA
Bid Date: Feb 21 2024
RFQ Construction Manager at Risk - Bartow County Water Department Expansion and Renovation - 5296087
Cartersville, GA
Bid Date: Jun 12 2024
Cartersville, GA
Bid Date: Jul 19 2018
Cartersville, GA
--
Cartersville, GA
--
Cartersville, GA
Bid Date: Mar 03 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--