BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Estimate: $830,000 This project was designed by Lockwood, Andrews & Newnam, Inc. (LAN). The bidding and construction phase engineering services on this project will also be conducted by LAN. Any questions regarding the project should be directed to Alex Concepcion, E.I.T or Paris Lake, P.E. with LAN at (713) 266-6900. In general, this work consists of: 1. Pre-television of lines to be repaired by point repair, service repair, combination point repair and service line reconnection, and cured-in-place pipe. 2. Pipe bursting of sanitary lines including service reconnections in kind, drop stack reconnections, and cleanout replacements. 3. Rehabilitation of sanitary lines by cured-in-place pipe. 4. Rehabilitation of a partially cast iron, sanitary sewer line with tuberculation. Note: cast iron portion is under the pavement. 5. Rehabilitation of sanitary sewer lines by point repair, service repair (including drop stack replacement), and mechanical cleaning. 6. Trench safety as required per Section 01561, throughout the project. 7. Site restoration including removal and replacement of damaged sidewalks, driveways, concrete patios, wooden decks, pavement, irrigation lines, turf, plants, shrubs, fences, trees, and other miscellaneous items as required. 8. Implementation and maintenance of traffic control when necessary or required. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. 9. Bypass pumping, to properly rehabilitate any sanitary sewer lines and manholes where a flow through bridge or plug is not a viable option. It is the responsibility of the contractor bidding the project to ensure the accuracy of the reproduction of all bid documents and construction drawings. This responsibility includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the unit bid quantities and/or bid amount.

Post-Bid

Roads / Highways

$830,000.00

Public - City

Paving, Site Work

23

10

2

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 28, 2024

img_map_placeholder

Multiple Locations, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.