BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in East Wenatchee, Washington. Completed plans call for site work for a fire / police facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Pavement repair at WVFD Station # 1 located at 377 Eastmont Avenue in East Wenatchee, WA. In Douglas County. Description: Pavement rehabilitation of existing SW section of drill ground. Removal and replacement of existing asphalt and curb with cast in place concrete as described in the request for proposal. At the existing Wenatchee Valley Fire Department fire station 1, perform the following work: Demo extruded curb and asphalt to base course 6’-0” beyond the top of slope to the concrete apron, Remove gravel base course to sub grade and stockpile for reuse Prep sub grade to proper elevations to accommodate pour in place barrier type curb and six-inch slab with #5 rebar and thickened edges. Preserve all adjacent surfaces and patch and repair any surfaces damaged during the work that is intended to remain or be reinstalled. Maintain structural integrity of the building at all times and cover and protect work from damage as needed to protect from vandalism, weather, and building entry by any outside element, etc. Demolish and/or remove all existing construction components, site improvements, systems, items, and equipment so indicated on the Drawings and as further required to properly implement the new work of the Contract. Remove existing earth, base course, and top course to a subgrade elevation appropriate for the new work. Compact subgrade and respread stored base course / top course, providing new imported base course as needed to achieve appropriate elevation prior to concrete placement. Compact to 95% modified proctor. Wenatchee Valley Fire Department is an equal opportunity and affirmative action employer. Minority and women-owned firms are encouraged to respond.

Award

Roads / Highways

$431,501.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
10
Bidding Soon
96
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

April 15, 2024

img_map_placeholder

377 Eastmont Ave, East Wenatchee, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.