Site work and paving for a mixed-use development in San Antonio, Texas. Conceptual plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:https://www.sanantonio.gov/portals/0/files/budget/fy2025/Adopted-Budget.pdf Install an underground storm drain system and an earthen channel outfall to include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable. This is a Hazard Mitigation Action Plan project. Project is included in City of San Antonio Fiscal Year 2025-2030 Page no 772 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/newsletter/2024/tgi-11-01-2024/texas-government-insider-11-01-2024.html San Antonio plans reconstruction, drainage projects totaling $58.7 million San Antonio will invest $58.7 million to enhance road infrastructure and upgrade drainage systems in conjunction with the city’s Hazard Mitigation Action Plan. Construction is expected to begin in 2025. The city will spend $35.2 million to reconstruct and improve the Marbach Road Area drainage systems and infrastructure. Plans include improving the area’s sidewalks, curbs and driveway approaches. In addition, San Antonio will upgrade the segment’s existing undersized storm drain system. The drainage portion of the project will also require the city to reconstruct roadways, curbs, sidewalks and driveway approaches as necessary. San Antonio will use $11.7 million to upgrade an underground storm drain system as part of the Frio City Road Outfall project’s first phase. The existing roadway is old and has deteriorating pavement, broken sidewalks, poor drainage and non-ADA compliant ramps. The city will widen the road, sidewalks, buffer greenspace and driveway approaches as part of the storm drain improvement project. The city will allocate $6.1 million to install an underground storm drain system in the Southwell North Area. The project will feature an earthen channel outfall to direct water flow. Plans include reconstructing roadways, curbs, sidewalks and driveway approaches. The $5.7 million Valley Hi Area Drainage project will revamp the area’s drainage, water crossings and roadways. The current street has a deteriorated drainage system that is no longer capable of sufficiently managing flooding. The project will replace the drainage system, improve two low water crossings and reconstruct roadside earthen ditches. In addition, the city will reconstruct the roadway, adjust utilities and build sidewalks, ADA-accessible ramps, curbs and driveway approaches. ---------------------------------------------- Project (23-03946) - Install an underground storm drain system and an earthen channel outfall to include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable. This is a Hazard Mitigation Action Plan project. This project is included in the city’s fy 2024-2029 Capital Improvement Programs. As of July 29, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$5,228,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
3
Bidding Soon
1,335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Southwell Rd, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.