BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and paving for a mixed-use development in San Antonio, Texas. Conceptual plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:https://www.sanantonio.gov/portals/0/files/budget/fy2025/Adopted-Budget.pdf Install an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable. Project is included in City of San Antonio Fiscal Year 2025-2030 Page no 773 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/newsletter/2024/tgi-12-20-2024/texas-government-insider-12-20-2024.html San Antonio investing $43.2 million for drainage infrastructure improvement The city of San Antonio will spend a combined $43.2 million to make significant drainage infrastructure improvements across several neighborhoods. Construction is expected to begin in fall 2025. The Wilcox Avenue Area Drainage project will cost $15.6 million to complete. The area’s existing conditions are swamped with drainage and sidewalk access issues. The project will prioritize installing a storm sewer system and reconstructing the roadway to accommodate new infrastructure. In addition, the city will make utility adjustments, build sidewalks, install ADA-compliant ramps, build curbs and fix driveway approaches. Another $11.3 million will support the second phase of the South Pine Roadway Drainage project. The stretch of road frequently experiences flooding and lacks sufficient underground storm drainage infrastructure to accommodate heavy rains. In addition, the area has variable curb heights, cracking roadways and gaps in the sidewalk. To resolve drainage issues, San Antonio will install underground storm drains and build roadside curb inlets. Road improvements will include updated concrete sidewalks, curbs, ADA-compliant ramps and driveway approaches. Utility relocations are expected to be incorporated into the project’s design as well. The city will spend $10.6 million to advance the first phase of the West Broadview Drive and Oakwood Drive Drainage project. The city will improve the area’s insufficient drainage infrastructure by installing a new underground storm drain system and additional inlets. The project will also require reconstruction of the roadway and installation of curbs, sidewalks and driveway approaches. The first phase of the Valley Hi Area Drainage project will cost $5.7 million to rework critical neighborhood drainage and road infrastructure. Currently, the area’s drainage system has deteriorated, leaving nearby residences and businesses vulnerable to flooding. San Antonio will focus on installing a new storm sewer system to protect residences and property from flood events. Like with the other projects, the drainage system will be supported with a fully reconstructed roadway, new sidewalks, ADA-compliant ramps, curbs, driveway approaches and adjusted utilities. ------------------------------------ Project (23-03948) - Install an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable. This project is included in the city’s fy 2024-2029 Capital Improvement Programs. As of July 29, 2024, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$9,487,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
101
Bidding Soon
2,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

Oakwood Dr & W Broadview Dr, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.