Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a service station / car wash facility in San Antonio, Texas. Working plans call for the renovation of a service station / car wash facility.
Cancellation Description This notice is being cancelled due to changes to the Statement of Work that caused significant changes in scope. Please see RFQ # FA301624Q5216 if interested in this project. Amendment 2: The purpose of this amendment is to extend the quote due date to 22 Aug 2024 at 2:00 PM CT. This is a temporary extension based on the site visit that was held on 24 Jul 2024 and resulted in a potential need for revisions to the Statement of Work. Revisions, if any, will be uploaded under a separate amendment at a later date. ------------------------------------------------------------------------------ Amendment 1: The purpose of this amendment is to provide the attached Question and Answer (Q&A) information and schedule a site visit. A single optional site visit will be held at 2130 Gary Ave, Bldg. 5004, JBSA-Lackland, TX, 78236 on 24 Jul 2024, at 10:00 AM CDT. It is highly encouraged that contractors allow ample time to access the JBSA-Lackland Visitor Control Center as delays will likely be encountered. All desired attendees must provide the following infomration to both RFQ POCs no later than 2:00 PM CDT, 19 Jul 2024: Visitor's name Date of birth Country of birth Identification type State or Country of Issue The Contractor shall provide all qualified personnel, equipment, tools, parts, supervision, labor, transportation, and other items necessary to bring a Coleman automated car wash to full functionality and safety and prevent/minimize future need for repairs. The damages are the result of a winter freeze and rodent infestation. The wash rack system was installed around 2008/2009. See attachments for more details. All questions are due no later than 22 July 2024 at 2:00 PM CT in order to be considered timely. The quoted price shall remain firm for 30 calendar days from the due date specified below. Description of Services: The Contractor shall provide all qualified personnel, equipment, tools, parts, supervision, labor, transportation, and other items necessary to bring a Coleman automated car wash to full functionality and safety and prevent/minimize future need for repairs. The damages are the result of a winter freeze and rodent infestation. The wash rack system was installed around 2008/2009. Scope of Work: Scope of Work Freeze: Replacement of Components: Supply and installation of 1/2 & 3/4 PVC pipes and fittings for flow lines as per specifications - 1 set. Special order of 1 X 28FT. High-Pressure Hose - 1 unit. Purchase and installation of Hose, WB, 1/2 x 87, MPT x MPT, WW Boom - 1 unit. Replacement of Hose, Boom To Disc Box, 1 X 45 - 1 unit. Replacement of Hose, Boom to Boom, 1 x 28 - 1 unit. Equipment Repair: Repair of Cat Pre-Soak Pump - 1 unit. Scope of Work rodent: Replacement of Components: Replace Receiver, Banner, 8 Channel WW 2.0 - 2 units. Replace Emitter, Banner, 8 Channel WW 2.0 - 2 units. Replacement of Cordset, 6m, 6con, QD STR CONN WW2.0 - 4 units. Replace Prox, Turk, 18mm, DC - 2 units. Replacement of Cable, Prox 15 Meter 90 - 2 units. Replace Cylinder, Air, Presoak Flip, WW 2.0 - 3 units. Replacement of Motor, Oscillating .13 w/Gear Box - 1 unit. Supply and installation of 1/4 Poly Tubing (Per Foot) - 40 feet. Supply and installation of 3/8 Poly Tubing (Per Foot) - 85 feet. Supply and installation of Wire, 18/2 Unshielded, PVC - 20 units. Replacement of MA, Swivel 90, Plated, 1/4 MPT X 3/8 - 3 units. Replacement of MA, Swivel 90, Plated, 3/8 MPT X 3/8 Poly - 1 unit. Replacement of MA, Swivel 90, Plated, 1/8 MPT X 3/8 Poly - 3 units. Supply of Tie Wrap, Black, 14 - 40 units. Supply of Tie Wrap, Black, 11 - 50 units. Supply of Tie Wrap, Black, 4 - 20 units. Supply of Hose, Push Lock, - 20 units. Supply of Misc 16ga Control Wiring - 1 unit.
Final Planning
Service Station / Car Wash
$150,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2024
February 21, 2025
2130 Gary Ave, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Aug 08 2024
San Antonio, TX
Bid Date: Aug 30 2024
San Antonio, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.