BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2024 at 8:00 PM

Updated March 22, 2024

Renovation of an educational facility in Pewaukee, Wisconsin. Completed plans call for the renovation of a educational facility.

C and I Building Renovations Waukesha County Technical College- Building - C043/C045 & C127/C129 Restrooms Renovations State the amount included within the Base Bid that covers demolition and reconstruction work (Architectural - including finishes, Mechanical, Electrical, Plumbing and Fire Protection) for all work in the C Building. ALTERNATE BID No. 001A State the amount to be added to the Contract if RTU-5, all associated new ductwork, exhaust fan, control work all all associated demolition work in room I123 is added to the project. See drawings and specifications for full scope of Alternate Bid work ALTERNATE BID No. 001B For rooftop unit RTU-5), Alternate Bid #001A shall be provided by one of the manufacturers listed as part of the standard bid process. The mechanical contractor, at their discretion, canalso provide a voluntary alternate for another manufacturer listed if the lead time is an improvement over what they are carrying in Alternate Bid #001A. If another manufacturer is less cost effective, but has a shorter lead time, the Owner is interested in reviewing this voluntary alternate. ALTERNATE BID No. 002 For all rooftop units (RTU-1,2,3 & 4), Base Bid shall be provided by one of the manufacturers listed as part of the standard bid process. The mechanical contractor, at their discretion, can also provide a voluntary alternate for another manufacturer listed if the lead time is an improvement over what they are carrying for their Base Bid. If one manufacturer is less cost effective, but has a shorter lead time, the Owner is interested in reviewing these voluntary alternates. Question Deadline 02/21/2024 at 2:00 PM CT All requests shall be directed via e-mail to: Mark Wershay, AIA, NCARB Zimmerman Architectural Studios, Inc. mark.wershay@zastudios.com The Construction Schedule is as follows: Start: C Building Restrooms: Monday, May 20, 2024 I Building Improvements: Thursday, May 23, 2024 Completion: C Building Restrooms Wednesday, August 14, 2024 I127 & I141 Labs Friday, October 4, 2024 All I-Building Improvements Friday, December 6, 2024

Award

Educational

$1,907,000.00

Public - County

Renovation

41

23

22

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
335
Active Projects
116
Bidding Soon
2,098
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

May 20, 2024

Project location map

800 Main St, Pewaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.