Site work and paving for a mixed-use development in Apple Valley, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
**As of March 29, 2024, project was awarded to McNamara Contracting, Inc., Inc., in the amount of $2,487,144.80.** Est. Value: $ 2,782,419.00 City Project # 2024-101, 2024 STREET & UTILITY IMPROVEMENTS 1,400 LF 4" PVC Sanitary Sewer Service Pipe 1,900 LF 8" SDR-35 PVC Pipe Sewer (Sanitary) 10 EA 48" Sanitary Manhole 1,000 LF 9" Sanitary Sewer Lining 12 EA Lining Sanitary Sewer Laterals (5') 2,600 LF 8" Watermain Ductile Iron Cl 52, w/ V-BIO 5 EA Hydrant with 6" Valve and Box 1,550 LF 1" Type K Copper Pipe 7 EA 8" Gate Valve and Box 1 EA 8" In-Line Insertion Gate Valve and Box (Wet Tap) 1,500 LF RC Pipe Storm Sewer (15", 18", 36") 22 EA Drainage Structures 7,700 CY Excavation - Common (P) 3,800 CY Select Granular Embankment 6,200 CY Aggregate Base Class 5 34,000 SF Concrete Walk (5", 6") and Driveway Pavement (5") 5,300 LF Concrete Curb and Gutter B618 2,300 TN Bituminous Paving 10,000 SY Sod 600 LF 9" Sanitary Sewer Lining (Bid Alt) 8 EA Lining Sanitary Sewer Laterals (3') (Bid Alt) With related items he bid bonds must be payable to the City of Apple Valley in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. Direct inquiries to Engineer's Project Manager Jodie Scheidt at (952) 953-2426. No bidder questions will be addressed after 10:00 am on Friday, March 1st, 2024. Bid Security in the amount of 5 percent of the amount of the Bid must submitted through Surety 2000 and accompany each Bid in accordance with the Instructions to Bidders. The Owner reserves the right to retain the deposits of the 3 lowest Bidders for a period not to exceed 60 days after the date and time set for the Opening of Bids. No Bids may be withdrawn for a period of 30 days after the date and time set for the Opening of Bids. The successful bidder must be a "responsible contractor." The term "responsible contractor" means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein, and further reserves the right to award the Contract to the best interests of the Owner.
Award
Roads / Highways
$2,487,145.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2024
April 15, 2024
Multiple Locations, Apple Valley, MN
Related To This Project
Apple Valley, MN
Bid Date: Mar 05 2024
Apple Valley, MN
--
Apple Valley, MN
Bid Date: Mar 06 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Mar 08 2024
Apple Valley, MN
Bid Date: Apr 18 2019
Apple Valley, MN
Bid Date: Jun 11 2020
Apple Valley, MN
Bid Date: Jun 04 2020
Apple Valley, MN
Bid Date: Jun 02 2020
Apple Valley, MN
Bid Date: Feb 04 2021
Apple Valley, MN
Bid Date: May 25 2021
Apple Valley, MN
Bid Date: Jun 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.