Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Wallkill, New York. Completed plans call for the renovation of a educational facility.
As of March 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established. sealed Bids, in duplicate, are sought and requested by the Board of Education, Wallkill Central School District Board of Education (hereinafter called "Owner"), for the Reconstruction to Wallkill Senior High School, John G. Borden Middle School, and Plattekill Elementary School. Separate bids are requested for the following Contracts: General Work at Senior High School - GC-1 in accordance with the Drawings, Project Manual (including Conditions of the Contract and Specifications), and other Bidding and Contract Documents prepared by: Tetra Tech Engineers, Architects & Landscape Architects, P.C. d/b/a Tetra Tech Architects & Engineers 10 Brown Road Ithaca, New York 14850 Bid documents info: A scanned copy of the deposit check can be emailed to projects@revplans.com. Once the scanned copy of the executed deposit check is received, Bidding Documents will be shipped. Mail checks to Lohrius Blueprint, 226 Newtown Road, Plainview, New York 11803. Plan deposit is refundable in accordance with the termsin the Instructions to Bidders. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs(either by providing FedEx/UPS account number or being charged a flat rate by the printer). As bid security, each Bid shall be accompanied by a certified check or Bid Bond made payable to the Owner, in accordance with the amounts and terms described in the Instructions to Bidders. The Owner requires Bids comply with bidding requirements indicated in the Instructions to Bidders. The Owner may, at its discretion, waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. The Owner will not waive informalities which would give one Bidder substantial advantage or benefit not enjoyed by all affected Bidders. Bids may not be withdrawn before 45 days following the Bid opening thereof, unless an error is claimed by the Bidder in accordance with the Instructions to Bidders. Question Deadline 02/29/2024 Submit requests for Bidding Document interpretation to the Architect, in writing using the provided Pre-Bid Request for Interpretation Form, at least five working days prior to the Bid opening. 2) Secondary Contact - only if primary is not available: Mr. Brian Devincenzi, Assistant Superintendent for Support Services, 1500 State Route 208, Wallkill, New York, 12589, Phone (845) 895-7102. A. The Work of the General Work Construction Contract includes but is not limited to, the following descriptions: 1. Renovations to locker rooms, bathrooms, ceiling, etc. Structural steel reinforcement for HVAC work, CMU, acoustical ceilings, ceramic tile, Painting drywall soffits, casework, and associated demolition work. a. Drawings 1) General 2) Code Compliance (AG Drawings) 3) Architectural (AA Drawings) 4) Structural (AS Drawings) 5) Hazardous Materials (AHAZ Drawings) 2. Coordination: a. Coordination with the work of all the other contractors. 1) Drawings a) All 3. NOT in Scope but coordination by this contract a. Roofing 4. Demolition: a. Asbestos containing material removal as shown in the contract documents and disposal per Code Rule 56. Follow all spec section as listed. b. Construction of hard barriers separating abatement areas from all other areas. c. Properly dispose of Hazardous & Special Waste as per spec section 020080 Asbestos Abatement Procedures d. Minor Demolition including but not limited to interior doors/frames/hardware, ceilings, interior walls and interior finishes. e. Removal and disposal of miscellaneous equipment including all existing wall mounted specialty items and/or equipment not shown if impacting work to be demolished. f. All cutting and patching necessary for work of this contract, including layout, sleeves, coring, debris removal, saw cuts, providing lintels, drywall work, grouting, painting, ceiling removal and replacement, etc. g. Prep opening to receive new work as described in the contract documents. h. Hard barrier as required by SED to separate workspaces from occupied space. 5. Temporary Facilities a. Provide and maintain dust protection. b. Provide and maintain continuous exits. c. Provide and maintain temporary heat and ventilation. d. Provide and maintain building safety and wayfinding signage. e. Provide and maintain Construction Manager's field office. f. Provide and maintain enclosures and partitions. g. Provide and maintain secure building entrances during replacement of exterior doors and frames. h. Provide Temporary Facilities indicated as Work of this Contract in Division 1 Section 01 50 00, "Temporary Facilities and Controls" 6. New Construction: a. Provide labor, material, and equipment to install cold formed metal framing b. Provide labor, material and equipment to install structural steel. Any removal of existing structural steel to perform work shall be removed in a safe manner and reinstalled after completion of work. Coordination of work shall be performed with HVAC and Electrical Contractors. c. Provide labor, material and equipment to install new ceilings. d. Provide rough and finish carpentry. e. Provide thermal and moisture protection, other than roofing. f. Provide all finishes including: resilient vinyl tile, carpet, painting, suspended acoustical ceilings, LVT and ceramic tile. g. Contractor shall include painting for full wall of disturbed areas. h. Any areas disturbed during demo shall be repaired to like new. i. Contractor to build protection at each room that has a smart TV and projector. 7. General Requirements, including but not limited to, additional items specifically indicated as the Work of this Contract. 8. Provide multiple shift work as needed to complete work as shown on milestone schedule. Work during the month of July and August can be performed during first shift and if required to complete work during second shift. All work outside of that shall be performed during second shift. It is the contractor's responsibility to include such shift work in their contract. The Owner will not be responsible for paying any cost associated with shift work. Contractors will be required to provide a detail schedule which will be approved by the Construction Manager for all shift work required prior to work commencing. 9. Provide for a thorough cleaning of the site and building (interior and exterior) immediately before final inspection. a. Maintain areas in a cleaned condition until the Owner occupies the space. b. Personnel: Experienced workman or professional cleaners. B. The Work of the General Construction Contract includes but is not limited to the Work that is specified in the Project Manual(s) and as shown on the drawings that form the contract plans. The Contractor is directed to examine all drawings since certain details and/or notes may appear anywhere therein that apply to his/her particular work. This prime contract is defined as, and includes, all Sections in the Divisions indicated by reference, and specific Sections noted: 1. Division 1 -General Requirements, all Sections, including Temporary Facilities indicated. 2. Division 2 - Existing Conditions all Sections 3. Division 4- Masonry all sections 4. Division 5 - Metals, all Sections 5. Division 6 - Woods and Plastics, all Sections except for 061026 Roofing Rough Carpentry 6. Division 7 -Thermal and Moisture Protection, all Section, except 070150.19 Preparation for Re-roofing, 075750 Coated Foamed Roofing Restoration, and 077200 Roof Accessories 7. Division 8 - Openings, all Sections except 085113 Aluminum Windows 8. Division 9 - Finishes, all Sections except 096466 Wood Athletic Flooring 9. Division 10- Specialties, all sections 10. Division 12- Furnishings, all sections
Award
Educational
$3,065,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2024
May 6, 2024
90 Robinson Dr, Wallkill, NY
Related To This Project
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
--
Wallkill, NY
Bid Date: Apr 04 2024
Wallkill, NY
Bid Date: Apr 19 2024
Wallkill, NY
Bid Date: May 23 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Mar 07 2024
Wallkill, NY
Bid Date: Feb 07 2024
Wallkill, NY
--
Wallkill, NY
Bid Date: Dec 14 2023
Wallkill, NY
Bid Date: Dec 28 2023
Wallkill, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.