BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Salt Lake City, Utah. Completed plans call for site work for a water / sewer project.

As of March 18, 2024 the project was awarded to Insituform Technologies Inc but no amount provided Notice is hereby given that SPRINGVILLE CITY INCORPORATED (OWNER) will accept bids for the construction of the 2024 TRENCHLESS SANITARY SEWER REHABILITATION project according to the Drawings and Specifications and in accordance with the Springville City Standard Specifications and Drawings Manual, and described in general as: Provide rehabilitation of approximately 717 linear feet of 8-inch and 2,028 linear feet of 10- inch sanitary sewer main utilizing the Cured-in-Place (CIPP) method in Springville, Utah. The work generally includes sanitary sewer pipe rehabilitation using CIPP, including cleaning, CCTV inspection, cutting off any protruding taps and/or roots, reinstating approx. 56 laterals utilizing "top hat" inserts, and related items of work. All communication relative to the Project and any questions which BIDDERs may have concerning the project shall be submitted online using the "Questions and Answers" section for this project at website The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the City. Only bids giving a firm quotation properly submitted and signed will be accepted. A PAYMENT BOND and PERFORMANCE BOND will be required by the winning CONTRACTOR and all necessary forms are also included in the CONTRACT DOCUMENTS. PRE-BID CONFERENCE A. A pre-bid conference will not be held for this project. Construction Substantial Completion Project will have 46 days to Substantial Completion from start of project. Must be completed before June 28, 2024. Construction Final Completion 14 Days after the Substantial Completion

Award

Water / Sewer

$1,280,000.00

Public - City

Site Work

6

18

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
543
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 15, 2024

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.