BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2024 at 8:00 PM

Updated April 17, 2024

Site work and outdoor lighting for a bridge / tunnel in Portland, Oregon. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

**As of April 16, 2024 project was awarded but awarded amount is not available.** **As of April 3, 2024 project was awarded to Willamette Light Brigade but awarded amount is not available.** The Multnomah County Department of Community Services Bridge Section is accepting proposals to implement, promote, administer and maintain the Multnomah County Morrison Bridge Lighting Program (Lighting Program). The Lighting Program will allow interested members of the public to purchase and pay for temporary lighting displays on the Morrison Bridge, via the Morrison Bridge programmable architectural lighting system. The County intends to award one contract to the proposer determined to be most qualified, having a clear understanding of the work to be performed. The maximum term of this contract is five years or a maximum of $150,000 which ever comes first. The County does not guarantee that any minimum amount of services will be purchased.

Award

Bridges / Tunnels

$490,000.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
48
Bidding Soon
1,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

May 1, 2024

Project location map

To Be Determined, Portland, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.